Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


what is civil enginnering & what you need of this course?


No Answer is Posted For this Question
Be the First to Post Answer

Post New Answer

More Civil Engineering Interview Questions

Please Clear My doubt . We Can Design the size of the beam by manually by the Length of the beam...What is the technique adopted

0 Answers  


what is the difference between two way slab and flat slab? what is the benifits of flat slab?

6 Answers  


HOW CAN I CALCULATE BENTUP BAR'S INCLIND DISTANCE ?

2 Answers  


What salary do you expect? to a 10 yrs experienced civil engineer?

6 Answers  


what is means of M50,M20,M15 like this please tell me ?

0 Answers  


providing, fixing, removal of pockets of size 100*150*300mm to 500*600*1000mm for foundation. the shuttering material used for making &fixing of pockets shall be removed by the contractor without damaged to pockets. if any damage occurred, the same shall be rectified by the contractor is to handover the pockets to forge shop engineer with proper marking of centre lines, levels etc.

1 Answers  


how to the steel dia without using d2/162

3 Answers   L&T, Supertech,


There are two buildings one taller and one shorter whose time period will be grater and similarly the frequency ?

0 Answers  


DESIGN PROCEDURES OF R.C.C ELEMENTS

3 Answers   TCE,


How can u prepare mix design for concrete?

2 Answers   L&T, Lafarge,


What isthe formula for square

1 Answers   Panchayati Raj Department,


What would be the quantity of cement:Sand:Aggregate (1:2:4) requirement for slab casting measuring 1mtr x 1mtr x 0.10 mtr (4 inches)?

1 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)