Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


Why compressive strength of only concrete cubes and cylinders tested ? why not other shapes?



Why compressive strength of only concrete cubes and cylinders tested ? why not other shapes?..

Answer / kosy

There are based on research which lead to establishing standards such ASTM,..

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

how to calculate column load bearing? how many weight capacity in 1m3 concrete? pls answere me sir.

2 Answers  


Difference between pre-tensioning and post-tensioning.

0 Answers  


what is the formular for measuring minimum depth of a foundation

3 Answers  


for brickmasonry strengthwise which bond is better?

4 Answers  


significance of specific surface area of particles?

0 Answers   Gammon,


what is the allowable silt % in river sand for Dam concreting.

3 Answers  


If the proportions of concrete is a:b:c i.e if "a" parts of cement,"b" parts of fine aggregate & "c" parts of coarse aggregate are mixed by volume. Then the resulting volume will have a volume of ------? How?

0 Answers  


How to marking the building

0 Answers  


1. 1. The mass of a chunk of moist soil is 34 Kg and its volume is 0.012 cu. Meter. After drying in an oven, the mass reduces to 14.25 Kg. Determine the water content, the density of moist soil, the dry density, void ratio, porosity and degree of saturation. Take G = 3.25

0 Answers  


how to calculate total cost for slab 35'×8'

0 Answers  


the amount which paid to contractor before starting work. what does it calls?

6 Answers   L&T,


IS code for Rolling Margin of steel

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)