how to calculate the quantity of material in 1 cubic meter Concrete?
Answer / kashif khan
Qty of concrete= 1 cum
wet volume = 1 cum
Dry volume = 1*1.54 = 1.54
First of all we calculate the ratio of concrete e.g 1:2:4
2nd step; Sum of ratio = 1+2+4 = 7
Qty of cement = 1/7*1.54 = 0.21999 cum/0.035 = 6.2854286 bages
Qty of sand = 2/7*1.54 = 0.44 cum
Qty of crush = 4/7*1.54 = 0.88 cum
Is This Answer Correct ? | 17 Yes | 0 No |
satart to end steps by step process of building construction...? i want to planning theme accuretly
what are the Task work of different labour.?
What is the difference between nominal mix and design mix?
1 what is the nature of your job? 2 what major product or service does your company offer? 3 hoiw does the knoledge of chemistry hels in your job?
what is the out turn of one masson in plastering, masonary work in 8 hours, with limited healper? what is the out turn of corpender in form work? wood work? in 8 hour with limited healper? what is the out turn of bar bendarin 8 hour with limited healper for slabs, beams, coloumn?
What is the result of cube in 7 days test ?
3 Answers Casa Grande, Heer Enterprises, Him Shikhar Construction,
what is diversion?
How can I make justification between using concrete grade c35 compare c37?
What is stripping?
what type of drawing used in the field construction?
What is Leastcount of 1. Total station 2. Theodolite 3. Dumpy level 4. Plane Table
If do cube Test for 28 Days,when shall can do testing? after completion of 28 days it means 29th day or 28th day which one correct?