How to calculate per inch area in a circle?(Dia is 2.17m)
Answers were Sorted based on User's Feedback
Answer / benny
The given diameter of circle is 2.17 meter
Inches equivalent of 1 meter is 39.37 inches
Therefore; Diameter D in inches = 2.17*39.37 = 85.433 inches
The area of a circle = (Π*D^2)/4
Where the value of Pi(Π)= 3.141592654
(Pi(Π)is constant ratio of circumference to that of diameter of a circle)
Thus; A = (3.141592654*85.433^2)/4
Area; A = 5,732.46 square inches
| Is This Answer Correct ? | 5 Yes | 3 No |
Answer / abdul rasheeth
the dmia of the circle is 2.17m
1METER = 39.37 inches
therefore 2.17*39.37=85.4329 inches
AREA OF CIRCLE =(3.141*4)*85.4329^2
= 5731.37 sq.inches
| Is This Answer Correct ? | 2 Yes | 5 No |
Answer / nadim abdulgafur shaikh
area of a circle 2 x pi x r
so
2 x 3.14 x 1.085 = 6.81 sq.mt
convert it into square foots by multiplying by 10.764
so 6.81 x 10.764 = 73.34 sq.ft
multiply by 144 to make square foots into square inches
73.34 x 144 = 10561 sq.inches
u can check my ans on google :D
| Is This Answer Correct ? | 0 Yes | 3 No |
Answer / r.viswanathan
The circle diameter is 2.17m means 85.43inches
Area in mtr. (3.14*2.17^2)/4 = 1.74 sqm
Area in inches (123.622*85.43^2)/4= 2640.352 sq.inches
| Is This Answer Correct ? | 3 Yes | 7 No |
what is the real de-shuttering time for rcc column,slaband wall
wha is frog?
advantages & disadvantages of using crusher dust instead of sand in r.c.c work
3 Answers L&T, Shm Consultants,
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
How to convert n/mm2 in to kg/cm2?
38 Answers Rvr Projects Pvt Ltd, Soma Enterprises, Unitech, Wipro,
Explain the advantages and disadvantages of using plastic and timber fenders?
Why the height of the bridges over the river are very low?
how do understand the plinth beam croos section diagram
What are the applications of cad?
For G+4 storied building having 76000 sft per each floor, can you prepare schedule in such a way that structure should be completed with in 41/2 months and finishing be completed with in 51/2 months?
what is the diffrence between Specific gravity & Density??
what is the procedure of wet seiving. n percentage of silt in different type of soil?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)