Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


1. why more stirrups are provided near the support?
2.where more stirrups is provided in a column and why?
3.why extra bars are provided at the top of beam?
4.what is the difference between overlap and lap lenght?
5.what is development lenght

Answers were Sorted based on User's Feedback



1. why more stirrups are provided near the support? 2.where more stirrups is provided in a column a..

Answer / anurag mishra

1-To couteract the maximum shear stress developped at support
2-the Maximum shear stress zone in a column exists at the distance of l/3 from junctons of column with beam / slab ,so in this zone more stirrups are required to be provided,
3-at the ends of the beams, maximum hogging moment zone exists which causes column for faliure at top layer. this is why extra bars at the ends/ junctions of beams ,in top layer are provided.
4-o/lap length is the length of bar which is provided in the rienforcement where two bars are jointed linearly
lap length is the minimum specified length required for overlapping of two bars. its length is fixed for various grades of concretes.
5-The minimum length of bar required for the development of perfect bonding with concrete at the ends is called development length .it is calculated by Qst/4.tou.b.d

Is This Answer Correct ?    39 Yes 5 No

1. why more stirrups are provided near the support? 2.where more stirrups is provided in a column a..

Answer / rakesh katkar

1 Because its junction where shear force is max & faliure
in case of earthquake

2 at the junction at L/2 zone where there are chances of
faliure

3 to counteract the max BM at the top

4 Overlap : itis the portion ofthe bar which is prolonged
at the otherside of the bar
Laplengh : it is the req distance of a bar to be joint
when there is shortage of total lenght

5 Development Length : It is the length where the bar ends
And it is caculated by Ost/4toubd

Is This Answer Correct ?    21 Yes 4 No

Post New Answer

More Civil Engineering Interview Questions

how to calculate steel quantity in plinth beam&footing

7 Answers   Enercon,


Tell me about triple point of water.

0 Answers   Bechtel,


what is meant by camber

1 Answers   NCC,


What is the amount of cement,sand and course aggregate(jully)(in kgs) required for the RCC of an area of 450 square feet and 5 inch depth if the concrete mixing ratio is 1:2:4(cement:sand:jully)?your answer will be very helpful.

1 Answers  


M20 Grade ratio? M30 Grade ratio? M40 Grade ratio ?

30 Answers   AB Group, Aparna Enterprises, CECL, Engineers India, intex, Jain Group, Keystone, L&T, Multi Engineering, National, Shrinath Buildcon,


how to calculate weight of 1.8 cum of aggregate

0 Answers   Engisol,


Which is default or standard size of tiles used in dado bathroom

9 Answers   Orbit Corporation,


what is workability,define it?

1 Answers  


if in column reinforcement lower dia connect to higher dia then from wher we want to start higher dia steel

0 Answers  


how much cement and sand required for 1cum rr masonry

0 Answers  


what are the criteria for choosing the span for the bridge (highway bridge)

4 Answers  


What is meant by struct column And stub column

3 Answers   L&T, Shoba Devlopers, TATA,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)