1. why more stirrups are provided near the support?
2.where more stirrups is provided in a column and why?
3.why extra bars are provided at the top of beam?
4.what is the difference between overlap and lap lenght?
5.what is development lenght
Answers were Sorted based on User's Feedback
Answer / anurag mishra
1-To couteract the maximum shear stress developped at support
2-the Maximum shear stress zone in a column exists at the distance of l/3 from junctons of column with beam / slab ,so in this zone more stirrups are required to be provided,
3-at the ends of the beams, maximum hogging moment zone exists which causes column for faliure at top layer. this is why extra bars at the ends/ junctions of beams ,in top layer are provided.
4-o/lap length is the length of bar which is provided in the rienforcement where two bars are jointed linearly
lap length is the minimum specified length required for overlapping of two bars. its length is fixed for various grades of concretes.
5-The minimum length of bar required for the development of perfect bonding with concrete at the ends is called development length .it is calculated by Qst/4.tou.b.d
| Is This Answer Correct ? | 39 Yes | 5 No |
Answer / rakesh katkar
1 Because its junction where shear force is max & faliure
in case of earthquake
2 at the junction at L/2 zone where there are chances of
faliure
3 to counteract the max BM at the top
4 Overlap : itis the portion ofthe bar which is prolonged
at the otherside of the bar
Laplengh : it is the req distance of a bar to be joint
when there is shortage of total lenght
5 Development Length : It is the length where the bar ends
And it is caculated by Ost/4toubd
| Is This Answer Correct ? | 21 Yes | 4 No |
what is relation between SPT N value and driving piles after conducting a soil test?
how much steel is required foe following components.. footing- plinth beam- column- beam- slab-
1.how to calculate the nails qty in shuttering of column,beam, shear wall. 2.how control the binding wire wastage in building project. 3.
WHAT IS DUCTILITY?
why we provide plastic sheet under lean concrete/pcc.?
what is the minimum reinforcement provided in beams,footings,slabs? what is the minimum soil bearing capacity to design a multistorey building
The foundations are placed below ground level, to increase?
1. What type of job are you holding at the moment? Name of present / last employer?
please i wont to know the full meaning of P V C
Machine mix is better than hand mixing to get––
how to check the quality of concrete
significance of specific surface area of particles?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)