1. why more stirrups are provided near the support?
2.where more stirrups is provided in a column and why?
3.why extra bars are provided at the top of beam?
4.what is the difference between overlap and lap lenght?
5.what is development lenght
Answer Posted / rakesh katkar
1 Because its junction where shear force is max & faliure
in case of earthquake
2 at the junction at L/2 zone where there are chances of
faliure
3 to counteract the max BM at the top
4 Overlap : itis the portion ofthe bar which is prolonged
at the otherside of the bar
Laplengh : it is the req distance of a bar to be joint
when there is shortage of total lenght
5 Development Length : It is the length where the bar ends
And it is caculated by Ost/4toubd
| Is This Answer Correct ? | 21 Yes | 4 No |
Post New Answer View All Answers
hoe much fine & sourse agregate required for concrete mix of 1: 1.5:3 by volume in Cu.Ft
What is the difference between one-way slab and two-way slab?
pls tell estimate for 1 kilometre length random rubble masonry 0.90 metre height 0.600 metre width
What is the yield of 100 litres of water and 10 kg of cement in grout mix?
please, what is the required bar for a column of 6mx6m the dept is 405mmx300mm,its an axially loaded ?
What are the different approaches in designing the floors of the service reservoirs?
what will be price of 1:2:4pcc per kg?
04. a. Slenderness ratio…………… 1 b. If the height of a stage is 15-0 & dia. of the prop is 5, the slenderness ratio is….… 1 c. If the height of a stage is 10-0 & dia of prop is 3, the number of bracing will be…… 1
What are moment of inertia and its importance in civil engineering?
How is improve my knowledge in construction industries....
Slab quantity
How to determine spacing of bars in slabs or beams
please give me the rates of RCC(CUM), PCC(CUM), Brick Work(CUM), Tile Flooring, Saria Shuttering
Sir how to find cutting length for footing steel bars in the shape of "u"
What is the meaning of soil reinforcement?