How much steel required in 900 square feet slab?

Answers were Sorted based on User's Feedback



How much steel required in 900 square feet slab?..

Answer / arul raj

Steel requirement Depends upon the nos of floors
if assume

upto 1st floor = 2.5kgs/sft
upto 6th floor = 4.5kgs/sft

Is This Answer Correct ?    6 Yes 6 No

How much steel required in 900 square feet slab?..

Answer / vairavel

sorry no ans
only quation
room size for 1 sqr athu evvalavu wait thankum
athu eppati calculate pannanum plice ans me

Is This Answer Correct ?    1 Yes 1 No

How much steel required in 900 square feet slab?..

Answer / shaikh ubaid

2200 Kgs

Is This Answer Correct ?    2 Yes 2 No

How much steel required in 900 square feet slab?..

Answer / manoj patel

It depends on the thickness of slab, Type of slab,ie either
one way or two-way slab.

For Quick calcualtion use approx 120 to 140kg/m3 of
concrete.

Is This Answer Correct ?    8 Yes 11 No

How much steel required in 900 square feet slab?..

Answer / rajesh.ch

1 SFT = 2KG
2400SFT = 4800KG

Is This Answer Correct ?    9 Yes 12 No

How much steel required in 900 square feet slab?..

Answer / shaikh masad

Steel for slab in 900 sft
Slab thickness 6" say 450 Cft x 2.5 kg = 1,125 kg

Right...

Is This Answer Correct ?    4 Yes 7 No

How much steel required in 900 square feet slab?..

Answer / rahul jiwtode

2.5kg/ sq.ft and 80kg/sq.ft for slab of residential building

Is This Answer Correct ?    1 Yes 4 No

Post New Answer

More Civil Engineering Interview Questions

We are into industrial flooring (epoxy flooring) business. We buy material from manufacturers.We supply and laying the to companies. In our billing what tax/ taxes to be claimed from companies? Are we applicable for only WCT or any else?

0 Answers  


CALCULATE QUANTITY OF RCC COLUMN

2 Answers   L&T, NBCC,


NP3 CLASS HUME RCC PIPE

1 Answers  


Is there any difference in IS 456 and IRC 15? 

1 Answers  


how many kg of 20mm, 10mm, dust available in one ton stone boulder

0 Answers   Nandi,






why does the most of civil engg is not intersted to going for teaching field?

0 Answers  


What is Architect-Prepared Contract?

0 Answers  


how material can be calculate for brick work in 1:6

3 Answers   L&T,


9. What have you done to improve or develop your knowledge / professional qualifications in the last year?

0 Answers  


types of concrete?

8 Answers  


calculate if the size of the beam is 300*500 then L for the top & bottom bar

2 Answers   ACPL,


which purpose we are provide groove at sides of door & window frames, columns & beams

1 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)