Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


why there is 1 phase and 3 phase but not 2 phase and 4 phase?

Answers were Sorted based on User's Feedback



why there is 1 phase and 3 phase but not 2 phase and 4 phase?..

Answer / ram kumar

There is 2phase supply, but it is dedicated only to the railways not for commercial and domestic use. and about 4phase, it's not Indian standards, and more conductors are required and structure of transmission tower will be huge in case for 4phase.

Is This Answer Correct ?    11 Yes 0 No

why there is 1 phase and 3 phase but not 2 phase and 4 phase?..

Answer / naresh

As Ram kumar says i.e. there is more no. of conductor will
required for more no. of phases is correct,and also for
large load we require more power which can be generated by
only three phase motor and a large kw motor cant be started
by single, two and foure phases, it required leading or
laging power which is only possible with three phase.

Is This Answer Correct ?    6 Yes 0 No

why there is 1 phase and 3 phase but not 2 phase and 4 phase?..

Answer / shal

Use root 3 foe each phase

Is This Answer Correct ?    0 Yes 1 No

Post New Answer

More Electrical Engineering Interview Questions

A group of machines (wind turbines) connected with 33KV feeder and each machines are having individual VCB. The 33KV feeder connected with 110KV/33KV substation. The 33KV feeder tripped by over current at Substation and fault recorded at Substation as OC-R&Y phase. Same time the group of machines VCB tripped by over voltage, the fault recorded voltage was above 66KV by numerical Under/Over voltage relay. While grid drop time, this much of voltage hike is possible?

1 Answers  


why capacitors cant used in genset to maintain power factor..??

2 Answers  


How u can give the overload setting to any motor protection relay for a HT motors with formula and Example?

0 Answers   OCL,


How to calculate the Efficiency of Chiller

0 Answers   Knight Frank, L&T,


what mean by power factor

2 Answers  


What is floating voltage?

1 Answers  


why all selected supply voltage are multiple of 11

1 Answers   Gamesa, Suzlon,


What is the meter used to check the DG sound level.and pollution check

2 Answers  


AC 230V BULB GIVING DC SUPPLY WHAT HAPPENS?

2 Answers  


Difference between copper earthing & aluminium earthing?

2 Answers  


how the 12 pulse rectifier is made?

8 Answers   Engineers India Limited,


the input mechanical power of a single alternator is increased,its RPM increased but in case of an alternator synchronised with grid its RPM does not increased with increase of input mechanical power. why?

3 Answers   Bhel,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)