Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


whatis the minimum strength required for M-25 grade
concrete in 14days compressive test? What is the procedure
of calculation?



whatis the minimum strength required for M-25 grade concrete in 14days compressive test? What is t..

Answer / prosun roy

A Concrete block when tested for compressive strength must
exibit a minimum of 70% strength by 14 days as per IS.
However it is seen concrete usually gains more than 90% of
its characteristics strength by that period if O.P.C is
used, PPC may delay.

Is This Answer Correct ?    17 Yes 2 No

Post New Answer

More Civil Engineering Interview Questions

How to come 1.54 from dry to wet concrete? 

0 Answers   ASZ, L&T,


WHAT IS THE CAUSES OF RUTTING ON FLEXIBLE PAVEMENT?

0 Answers   Ace Info, Anil Group,


a solid steel rod length 2m dia and 20mm vertically hangs from celling and has a collar firmly atteched to it. above the collar an annular rubber washer of 40mm th. having stifness k = 5n/mm is placed. determine maximum stress in the rod caused by mass of 5 kg falling through a height of 1.2m.

0 Answers   Sail,


How to calculate 1 brss for RCC work  

0 Answers   Allied Group, Jyoti Structures Ltd,


What is the difference between auto & dumpy level

7 Answers   L&T,


how to calculate labour strength for work for RCC,brickwork,blockwork,in &out plaster,flooring,dado,door frame & shutter,painting etc for constructing highrise building?

0 Answers   Simplex,


I heard Thump rule about beam depth is 1" per 1' length. Is this correct? If not please tell me the thump rule.Thanks.

2 Answers  


coarse sand has a fineness modulus in range of

2 Answers  


how to know 28 day strength of concrete knowing 3 day or 7day strength of concrete???

3 Answers  


What is plate load test?

7 Answers  


WHAT IS YOUR EXPECTED SALARY?

0 Answers   ADITI, Allfon, Amazon, Ralph Lauren, Starbucks,


What is the life of reinforcement?

3 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)