what is singly & doubly rc beam? what is difference between
them?

Answer Posted / anil kumar

singly rc beam is defined as in which single bent up bar is
used & doubly rc beams may be defined as in which two or
three bent up bar are used are termed doubly reinforced beam

Is This Answer Correct ?    1 Yes 10 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is the ideal size of the living room ranges from small to large size?

754


You have 3 snd sample of different FM=0.21,FM=0.95,FM=2.90 which one is suitable for a)plastering on R.C.C b)plastering on masonary wall c)concreting column d)concreting of bored pile.also justify your answer.

1868


how much cement sand n bricks required in im3?and how much in plaster?

2206


4. Differentiate between NC and OC soils. Draw curves for (i) Stress vs Strain (ii) Volume charge vs Strain (iii) Pore pressure vs Strain for these soils

2392


sir how can we find the cement and sand required for making 4" drop

1767






What is the Unit weight of coarse sand (F.M- 2.20) ?????

1533


what is BPM in concrete demolition hammers. what is better a higher value or lower

2348


Does degree of bend of rebars has any effect on strength of the member? For example- if a beam is designed with 45 degree bent up bar with respect to architechtural needs and is not 45 in practical so will there be any reduction in the strength of member?

1574


do we consider shrinkage factor for calculating cement consumption for CM mixes for different works?

1343


How much qty of stone ; sand; cement in R/R stone masonry of 136 CUM

1612


Rate analysis for construction of a solid block masonary of size 400x200x200 in C.M.1:5 in superstructure .Compressive strength 5.00 N/Sq.mm Confirming to IS: 12894:1990, with necessary scaffolding, raking of joints and pointing the same. I require rate per Cum.

2110


how to take concrete quantity for precast segment for viaduct project?

2692


The portion of a brick cut across the width is called?

1099


What is the significance of cost estimate knowledge for an architect?

1242


Process of pcc in wateredug

1898