Answer Posted / yisahak
Generally form-work shall be stripped off after the concrete has attained 50% of the 28 day cubic strength, or when it attain twice the stress it will then be subjected after the removal of the form-work, which ever is greater.
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
SAND AND STONE AGGREGATES WASTAGE PERCENTAGE IN CONCRETING WORK?
Why you are leaving present job?
What are the alternate material for steel, Sand and aggregate
In cement making,what is meaning of blend,fineness,density.
pls tell me , what is the water content
What is the ideal size of the living room ranges from small to large size?
can you give me the details of rate analysis of steel and concrete?
quantity of sand and cement for 10m2 plastering 10mm thick for the ratio of 1:4,1:3and its leabour data
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
what could be the production cost of 1 cum of concrete by CP30 plant
What is the name of this multiplication factors ?
If 40 backlogs are cleared m finally with 65 percent marks . Am I eligible to get visa to US
significance of specific surface area of particles?
I want to know the material required per Square foot in rcc roof i.e.Steel ,Cement,
what is the composition of good brick ?