If the output of a 100kva, 415v generator is stepped up to
11kv with a 500kva transformer,can the transformer be
Loaded above the source generator loading?
Answer Posted / kushal parikh
Transformer can be loaded upto 5 times as generating source is 100kVA and transformer is of 500kVA. Other source can be added by putting it on same bus.
Let me know if i'm wrong.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
There is air in a room . the top and bottom of the room are at constant temp. T1 and T2. DRAW THE temp profiles if a. T1 greater than T2 b. T1 less than T2
how to wiring it with contactor and timer together
do anyone out there know where to find a compleete list on acronyms/abbreviations used in offshore electric engineering. MCB - Micro Circuit Breaker, MCCB-Mouldes Case Circuit Breaker, ELCB-Earth Lekage Circuit Breaker, ELMCB- etc.....
lenz law application and define
From past few months I am getting lagging pf even though sufficient capacitors used in circuit. Where is the problem pls answer
Draw torque - speed curve and load curve of induction motor? mark operating point ?
Which type of motor is used in trains, what is the rating of supply used explain working principal?
While testing LA mast,What are the parameter limits ?
Why strting torqe high in inducation motor?
how to design coil turns ?
True or false question. 1.The fuse provide phase and neutral 2.power loss in electrical circuit can take place in (resistance or inductance or capacitance). 3.two phase system each phase has separated by a phase difference of (90 or 180 or 270 or 45). 4.3 phase balanced star connected load neutral current shall be (line current or phase current or zero or unity)
where was current transformer protection units used and why??
WHY THE RATINGS OF THE TRANSFORMER IS 33KV WHY NOT OTHER???
what is p.s impedance measurement test in earthing transformer?
State nyquist stability criterion.