Is there a way to know the aprox shuttering qty if vol of
concrete is known? any thumb rule?
Answers were Sorted based on User's Feedback
Generally for high rise building shuttering is taken as 3.5
times of floor area
but in case where there are Post tension slab the ratio is
taken as 3
Is This Answer Correct ? | 6 Yes | 1 No |
Q:What is the formula of bar to bent the slab in bent slab? Second question Q: what is formula to calculate the hook?
how do i find the fixed end moments in the fixed beams with the use of general method?
what is mean by bitumen emulsion
Is there is any formula for calculate the correct length of rebar while it bending in 45 degree/90 degree and cranking???
What is the density of most of construction materials?
What is full form of r.c.c?
What is meaning of FREE STANDING STAIRCASE ?
what is the cement mortor thickness for 23 cm brick work and 11.5 brickwork?
how much st. steel is required for staging of concourse slab of a elevated metro station allowing through traffic .
Plese tell me about cranked beam (end hook lenth, crank angle, crank length). Thanks.
how many types of survey and what are levelling instrument?
how to calculate sand, cement quantity for plastering (1:5)? what"s the formula?