Generally for high rise building shuttering is taken as 3.5
times of floor area
but in case where there are Post tension slab the ratio is
taken as 3
| Is This Answer Correct ? | 6 Yes | 1 No |
How to use of me trial wall plaster 6mm , 10mm par sqm. use in sand and cement ?
What is command line?
whats are the max value of providing of super-elevation in road way in various condition?
WHAT IS NON DESTRUCTIVE TEST?PLEASE GIVE ME THE PROCEDURE?
How many kilo-newtons equals 1000 kilogram?
I need old MMUP exam question and answer for Civil engineering
How to calculate laplength for 3 floors
what"s the sort of beams?
Curing time for 1)R.C.C slab 2)B.W 3)Plastering
what is plate load test??
what is the development length formula as per concrete grade
what is calculation of cement, snd of 1:4 16mm,12mm plastring
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)