3,6,13,26,33,66,____
Answers were Sorted based on User's Feedback
Answer / divya
Here v r having 2 series
3,13,33
and
6 26 66
13-3=10
33-13=20
so the next num vll be
x-33=30
x=63
V can say this ans right by considering the sec series also
3,13,33,63 ending didit should b 3
| Is This Answer Correct ? | 109 Yes | 26 No |
3
3*2=6
6+7=13
13*2=26
26+7=33
33*2=66
66+7=73
SO ANSWER IS 73
| Is This Answer Correct ? | 82 Yes | 27 No |
Answer / barath
separate the series in to 2 parts ..ie
3,13,33
then 2nd sequence will be
6,26,66
the diff btwn no.s in the 1st sequence is 10,20, and so on
diff in 2nd sequence is 20,40, and so on
next no. will be 33+30=63
ans is 63
| Is This Answer Correct ? | 16 Yes | 12 No |
Answer / saikrishna
MULTIPLY BY 2 AND ADDITION 7 ALTERNATELY......ANSWER IS 73
3*2= 6
6+7= 13
13*2= 26
26+7= 33
33*2= 66
66+7= 73
| Is This Answer Correct ? | 4 Yes | 2 No |
Answer / cnu
3,6,13,26,33,66,____
here we have two series 3,13,33--eq1 and 6,26,66--eq2
by observing both series 1st series is doubled to get second one
eq1)3,13,33 eq2)6,26,66
3+2(pw0)*10=13 6+2(pw1)*10=26
13+2(pw1)*10=33 26+2(pw2)*10=66
33+2(pw2)*10=73 66+2(pw3)*10=146
3,6,13,26,33,66,73,146
| Is This Answer Correct ? | 11 Yes | 13 No |
Answer / ramir v. agustin
3+10=13
6+20=26
13+20=33
26+40=66
33+40=73
66+80=146
3,6,13,26,33,66,73,146
| Is This Answer Correct ? | 4 Yes | 12 No |
Answer / cbsrinivas
i think the next is 71
here we have 3,6,13,26,33,66 ok
1st 3+3=6
2nd is 6+7=13
13+13=26(following same order)
26+7=33
33+33=66
so obvioisly the nxt will be 66+7=71
| Is This Answer Correct ? | 4 Yes | 34 No |
Quantity of cement in kgs for different proportions and different thickness in plastering work per 1 sq.m. And how to estimate this quantities.
2 Answers Al-Jaber, IVRCL, L&T,
What is the unit weight if concrete?.
28 Answers Doshion, HCC, Jindal, KKR, RCL, Simplex, TCS,
How to replace dia of bar in beam like 25mm 3no.S at bottom But due to some reason on site 25mm bar is not available Then is it ok to provide 20mm 4no.S? Give description or Formula to calculate area of steel and replacement?
10'0" × 10'0" Proposed room Start and Finish How many Cement & Sand & Bricks & Metals & Steels Need
Please give me the mixing ratio for higher grades of concrete (M30, M35, M40, M45, M50) using cement, VSI sand (Maharashtra) and metal. In case any other additives are supposed to be added to my concrete please let me know about that as well.
WHAT IS THE MELTING POINT OF STEEL?
1) what do you mean by rolling margin of steel ? 2)pls. tell the cut length formula of stirrups as per IS codes(take out cut length for a beam of 600*300mm with 40mm cover all sides)? 3)what is the multiplying factor of painting for sand faced plaster? 4)if your footing is of size1.9*1.6m . what quantity of length and width you will excavate means what extra margins you will allow as per IS codes in billing?
what quantities of work done in terms of sq.mts/day/ of 8hrs for each varpenter (shuttering) and Steel fitter in terms of Tonnes. For slabs, Columns etc.?
What is M40 _ TOR - EQ and B.F.S
0 Answers Odisha Hydro Power Corporation, Ramky, Simplex,
calculate qty of sand in 15 mm plaster for 100 sqm.
.5Ast
Actually i am confused that how to calculate the bending moment for a semi-circular beam and curved slab.If any one have a good idea about the matter,please give the answer with a suitable example. Thank you......
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)