Is there a way to know the aprox shuttering qty if vol of
concrete is known? any thumb rule?

Answer Posted / dushyant bansal

Generally for high rise building shuttering is taken as 3.5
times of floor area
but in case where there are Post tension slab the ratio is
taken as 3

Is This Answer Correct ?    6 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is the origin of name railway sleepers?

844


Explain what is progress payment?

717


what is called the inverd level of mabhole chamber?

1634


the distrubution system in water supplies is designed on the basis of avg daily demand peak hourly demand coincident of draft greater of B & C

1577


what is conrete grade ,how are depent on concrete grad and size of concrete?

2054






If specific gravity of cement is less than 3.15 what is the cause?

1873


How many bricks are there in 100cft?

844


What do you mean by honeycomb in concrete?

713


Special thing in designing a overhead reservoir ? which is different from an ordinary design

760


Which is the direction for positive angle?

731


mix design procedure for 1:6 cement mortar

1742


I was once rejected for US visa in early August. But now I'm going again for interview next week. What are the chances that I will faced the same VO????

1657


Critical Path Method is...

1586


Specific gravity of cement?

1210


Define What is a kip?

730