Is there a way to know the aprox shuttering qty if vol of
concrete is known? any thumb rule?

Answer Posted / dushyant bansal

Generally for high rise building shuttering is taken as 3.5
times of floor area
but in case where there are Post tension slab the ratio is
taken as 3

Is This Answer Correct ?    6 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

if 20mm aggregate is coming by weight 25 ton in a 10 wheeler hywa ,then what will be total volume of aggregate in cubic feet.

828


List out some of the common problems that architect have to tackle it?

723


Why are steel plates inserted inside bearings in elastomeric bearing?

925


Please send me the qunty. of mason/labour required in each day for different type of civil construction work?please send me ans. in my mail.my mail id is (parthamitra086@gmail.com) or here.

2051


How to determine thee cut length for steel reinforcement bars in R.C.C design

1154






calculate the quantity of cement ,sand,bars and aggregate used for 28*4 ft with 4 inch (125mm) thick

1453


what is m30 in concrete tiles

1982


What is a projection line?

806


What will be the exam pattern and syllabus for j.e post of haryana staff selection commision? Advt no. (02/2015) Some people says it would only be objective type question papers while others say it would be same as ssc (1 objective,1 conventional) ?? Please answer this question it is needfull to all.

1425


How do you determine specific gravity of cement?

790


What is the purpose of the gap in the road on this bridge?

786


what should be the PCC ratio to construct a plinth of (40x40x4)ft...??also its estimated cost??

2737


What is the tallest man made structure in the world?

737


How much Tolerance factors like 1. brick work 2.plaster 3.painting 4.floor tiling 5.wall tiling 6.shuttering 7.concreting 8.steel

1492


how much tempareture are required to make liquid state of pid leed

1821