Is there a way to know the aprox shuttering qty if vol of
concrete is known? any thumb rule?
Answer Posted / dushyant bansal
Generally for high rise building shuttering is taken as 3.5
times of floor area
but in case where there are Post tension slab the ratio is
taken as 3
Is This Answer Correct ? | 6 Yes | 1 No |
Post New Answer View All Answers
What is the origin of name railway sleepers?
Explain what is progress payment?
what is called the inverd level of mabhole chamber?
the distrubution system in water supplies is designed on the basis of avg daily demand peak hourly demand coincident of draft greater of B & C
what is conrete grade ,how are depent on concrete grad and size of concrete?
If specific gravity of cement is less than 3.15 what is the cause?
How many bricks are there in 100cft?
What do you mean by honeycomb in concrete?
Special thing in designing a overhead reservoir ? which is different from an ordinary design
Which is the direction for positive angle?
mix design procedure for 1:6 cement mortar
I was once rejected for US visa in early August. But now I'm going again for interview next week. What are the chances that I will faced the same VO????
Critical Path Method is...
Specific gravity of cement?
Define What is a kip?