In PC for the std cost of proc raw material say A,B,c,D
with prices 11,14,10,16 and if I want to pick price 14 as
std cost of a product
how would you do the configuration in CO-PC
Answer / kaustav
Create a BOM for the SFG/FG with the product B which has the
value 14.
Is This Answer Correct ? | 0 Yes | 0 No |
What are the categories of variances in co-om-cca? : co- cost center accounting
Dynamic and Static Postings, Explain the Differences in Brief
open&closing periods in sd?
What is profitability analysis (co-pa)? : co- general controlling
what is the FI-MM Flow?
Suppose i am open with 2 other login in sap.. 1st is normal 2nd with Crm so now, how much session open in same time. But login is not same? but we can access the both login?
Explain real scenario your faced in the implimentation project?
0 Answers Accenture, IBM, Wipro,
Pls send me some tickets and answerw purpose of interview?
How do you configure reason codes for residual payments? What are all the steps? What are the T codes used?
What is a company code ? Describe its relationship with a controlling area?
a cost element is used for some cost center but only in some case like discount allowed particular internal order should be picked? can any one help me?
What is Data set in SAP ?