hey guys i recently saw a long transmission line in which a
sort of balloons in red and white color were hanging at each
section.do u have any idea why are they kept for?
Answers were Sorted based on User's Feedback
Answer / eweph
Its purpose is mainly for aircraft warning device as cables is hardly visible for the aircraft.
| Is This Answer Correct ? | 7 Yes | 2 No |
Answer / ashish
during the maintenance of xmission line this sort of tech
is used. in this way red ballon are placed over that
section which may b in any possible way may be faulty and
results u static charge. thus this provide information to
the person who is maintaining the cable that which region
is hazardeous.
| Is This Answer Correct ? | 2 Yes | 2 No |
Answer / charu
ya they are indication to flying planes, helicopters etc ythat transmission lines are present. because lines are not visible from aircrafts and they can and have faced accident in the past
http://while-working.blogspot.com
http://electrical-engineering-tutorials.blogspot.com
| Is This Answer Correct ? | 1 Yes | 1 No |
what is meant by bus bar and outgoing/incoming breaker in an electrical/electronic circuit
1) How to calculate battery backup for ups as well as solar with complete formula elaborately......
What is the safety protection? Name the protections of Transformer?
what is difference between isolation and ultra isolation transformer?, what is the method of testing ?
In both 600/1000 V cable and 450/750 V cable, we can supply 415 V. However for distribution, all utilities are using only 600/100 V instead of 450/750 V. What is the reason?
Draw a SLD for main panel for school having connected load of 1200kw and emergency generator 200kw.also show the increase of additional load of chiller 225kw in the lv panel indicating meter postion size of transformer ,cables and capacitor bank.
what you have to see after one week or month from the day of installation of transformer ?
how dose servo motor works
is it value of power factor is more than unit. whats effects in the source supply
As per standard, transformer body earthing and other Equipment earthing (Equipment earthing) did not connect. but in LT side termination we are doing metal glanding in both side Transformer to PCC Panel through armoured cable, now X'mer body earthing and PCC Pane earthing (Equipment earthing) both are connect.is this safe for X'mer or other equipment?
A resistor,inductor and capacitor are connected in series respectively.Voltage across resistor is 40v,across inductor is 70v,across capacitor is 100v.Then what is the total voltage applied across the elements?
How to calculate the 2500 Kva Transformer losses Primary 11KV Secondary 415volts
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)