hey guys i recently saw a long transmission line in which a
sort of balloons in red and white color were hanging at each
section.do u have any idea why are they kept for?

Answer Posted / charu

ya they are indication to flying planes, helicopters etc ythat transmission lines are present. because lines are not visible from aircrafts and they can and have faced accident in the past

http://while-working.blogspot.com
http://electrical-engineering-tutorials.blogspot.com

Is This Answer Correct ?    1 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

to hook up ten 50 amp rv pedastels at a lenth of 600 feet from the service what size will my service need to be and the size of wire will I have to run to each pedastel in series??????

1505


pre arcing time of ehv breaker

1685


why does a dc machine has high efficiency while working as a generator than as a motor ..

1492


Please tell me the earthing procedures adopted for the STAR-STAR 3 Phase transformer in india and give a better sugession for earthing

1515


i am completed my degree(B.E EEE) 2014 anychance to get electrical licence plz help me

1681






how we calculate electrical load on a building according to area?

2275


we need a ntpc previous papers

1461


which mm cable should be used for 1.hp immersible pump motor for the distance of 330 metres?

1265


advantage of motor design on higher power factor . normally motors are designed for .8 power factor. what is advantage of designing at .88 power factor

1403


what is automatic voltage regulator?we can control the vlotage by using fuzzy controller in matlab?why we go for fuzzy?

1503


what are the range of memory address in plc for L&T lx7 4A

1817


how can service sitting be setted for MCCB?Example for sittings IR (CURRENT RATING),IS(CURRENT STARTING)IO (current operating

1932


we have require a Motor (1500kW, 6.6kV, 50Hz) which shall operate at 1500rpm during 30min and after it shall run on 500rpm during 15min. The same cycle shall be repetitive during the whole working days. Which method is best and economic to achieve such type of task. VFD, VVFD, Pole changing motor etc.

1502


how to store the thunder power?

3788


EXPLIAN THE IMPORTANCE OF POLY PHASE CIRCUIT.

1663