what is cost component structure both splitting and
switching?
Answer / kaustav
Splitting structure : If a cost center provides two or more
activities, then we define a splitting structure to inform
the system to break up the cost into the activities tagged
to the CC through the splitting structure
Switching structure ; If we do not want to retain all the
cost components of a cost center to the primary cost center
we use a switching structure. For example, we have a
summarization cost center in which labor, overheads and
materials are charged. the same can be trfd to the primary
cost component structure wherein the same will be added to
respective cost components. However if we want to retain all
the cost components as single component say Energy, we
create a switching structure in which we assign all the
elements to the energy component. In the planning layout, we
assign this switching structure to the required CC
Is This Answer Correct ? | 1 Yes | 0 No |
Hi One small Question please Can anybody please let me know the Difference between Account Based Profitability Analysis and Costing based Profitability Analysis?
what is account assignment in MM?
What is Global company code? Have u worked on that?
day limit means? lgs
Folks, Can somebody enlighten on doing inter company eliminations without using consolidation module(EC-CS).Can we capture the G/L line items directly (FBL3n)and do some ABAP to get the desired results
what do you enter in company code global setting ?
What is the meaning of Retained earning account ? why it is mandatory area in SAP FI
what is meaning of rest and reversal & reset
What is the difference between the R/3 4.6version to R/3 4.7 version?
what is the configuration steps of cash flow statement?
how the invoices can be blocked?
What is SAP Product Life Cycle(PLC)?