what is cost component structure both splitting and
switching?
Answer / kaustav
Splitting structure : If a cost center provides two or more
activities, then we define a splitting structure to inform
the system to break up the cost into the activities tagged
to the CC through the splitting structure
Switching structure ; If we do not want to retain all the
cost components of a cost center to the primary cost center
we use a switching structure. For example, we have a
summarization cost center in which labor, overheads and
materials are charged. the same can be trfd to the primary
cost component structure wherein the same will be added to
respective cost components. However if we want to retain all
the cost components as single component say Energy, we
create a switching structure in which we assign all the
elements to the energy component. In the planning layout, we
assign this switching structure to the required CC
Is This Answer Correct ? | 1 Yes | 0 No |
pls.let me know, what will be created at client level and company code level.
Explain bank statement in cash management? : fi- general ledger
Name three ways of posting acquisition cost to a fixed asset master?
I NEED A TICKETS IN FI FOR G/L A/P A/R ASSET W.H.T IN THOSE I NEED SUPORT ISUUS PLS
Hi What is a STAGING CLIENT in our Land scape? a bit of confusion in this
could any post the real time issues related to FICO.
what is payment terms. what is the diff. b/w terms of payment and payment terms
what is the path for Automatic payment?
where is excise amount posted?is he asking abt table name or any other t code? if he said table name so how to find the table name?
What is asset master?
What are organisational units in sap ?
Where can we see existing Validations and Substituitions ?