Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what"s the responsibilities for QC(quality controler)in high
rise buildings?

Answer Posted / ksrao

Inspection of works three 3 stages
Pre construction : input materials testing
During construction : cocrete- w/c ratio cubes casting ,Brick work - proportion of cm,joints etc
Post construction:finishings, levels,testing of strengths with CTM,core cutter,NDT tests

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is the substitute of Mastic Asphalt?

8117


Design a built-up column carrying an axial load of 1200 KN. Its length is 8m and it is effectively held in position at both ends and restrained against rotation at one end. Assume yield stress of 250 mpa

2206


Define What is the tallest man made structure in the world?

1257


What is meant by engineering drawing?

1058


What happens when water mixed with cowdung is used for priming instead of water for lifting water in pumps?

2291


what do you know that m20,m25

1896


what is the formula to find the diagonal shape stirrups?

1909


What you understand by richter scale?

1210


what is the function of GSB all class ?

1239


what is the anchorage length of reinforcement.

1763


what does the track parameter mean in staad.pro?

6081


What in your past experience or education prepares you for the position for which you are applying

2219


What happens when,in Prestressed girder the HDPE duct and cone size is provided more than required? (technical answer expected)

2112


Define absolute co-ordinates?

1305


Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?

1811