"how can we find the approximate quantity of materials using
in a building or total Expenditure in percentage for rough
estimate after known the construction area(sqm)".please if you
know something about that please post the answer.
No Answer is Posted For this Question
Be the First to Post Answer
Caching, Multithreading and RAMBUS are 3 methods for resolving the Bottleneck problem. Please give an explanation for each one (how are they resolve the problem?)
what is westage % for steel, concrete,tiles,pains as per indian staderd code?
6 Answers DLF, Engineering, Lodha, Tata Steel Limited,
Suppose a new brick wall is being constructed,and the courses and not aligned horizontally,what negetives can it cause?
How much quantity of coping is done per day by one mason in Rmtr?
What is the pet difference between bent up bar and cranked bar ?
1 Answers Foundation Stone, GHH,
Suggest how many column, beem, etc required for 30 mtrs x 21 mtrs width x 8mtrs height for industrial shed of ground floor. I want to know the quantity of tmt steel consumption and Concrete consumption for budgeting
0 Answers Vishal Pipeline And Engineering,
difference between ordinary portland cement concrete strength and pozzolona portland cement concrete strenth
how much percent are used 20mm,10mm?
what is the unit for sbc of soil
How many bricks in one cubic meter? Birck size 22.9*11.4*7.6 joint 12mm Give me answer with calculations
how to calculate triangular ring cutting length
Can we use the flyash bricks in brick bat coba?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)