"how can we find the approximate quantity of materials using
in a building or total Expenditure in percentage for rough
estimate after known the construction area(sqm)".please if you
know something about that please post the answer.
No Answer is Posted For this Question
Be the First to Post Answer
How much wastage we considered for cement
How to calculate no of 12 mm dia bars in a ton
what are the functions of wall
what are the natural dynamic pressures on a structure in coastal region like chennai, vizag etc,
My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).
WHAT IS THE MAIN DIFFERENCE B/W HIGHWAYS AND MOTERWAYS?
While calculating quantity of cement required for 1 qubic meter If mix is m25 1:1:2 =4 1.52/4=0.38, 0.38x1440=547.20 kgs I know 1440 is unit weight of cement And what is 1.52 ? And some one using 1.54 and 1.53 etc... Why they are using can u explain me what is 1.52, 1.53, 1.54?
what is the lap length on column? state the farmula plz with explaination.
Lapping Work Explain Briefly
cement and sand required for one block of size 0.23*0.15*0.46
when we workout quantities of reinforcement steel , whate are the critari of lap length for column