Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


What is the lap length for tension members if you have 16 dia steel bar and a concrete fc=30.9 and steel grade60 fy=414 mpa

Answers were Sorted based on User's Feedback



What is the lap length for tension members if you have 16 dia steel bar and a concrete fc=30.9 and s..

Answer / sajin

If it's a compressive member the lap length will be 50d. ie 80 cm and for tensile member it will be 24d. ie 38.4 cm

Is This Answer Correct ?    1 Yes 0 No

What is the lap length for tension members if you have 16 dia steel bar and a concrete fc=30.9 and s..

Answer / sahilshah.civil@gmail.com

lap length of 16 mm dia bar = 38 d = 38 X 16 = 608 mm

Is This Answer Correct ?    2 Yes 3 No

What is the lap length for tension members if you have 16 dia steel bar and a concrete fc=30.9 and s..

Answer / meena garg

lap length in tension member 30d
so lap length is 480

Is This Answer Correct ?    1 Yes 2 No

What is the lap length for tension members if you have 16 dia steel bar and a concrete fc=30.9 and s..

Answer / king

40d

Is This Answer Correct ?    1 Yes 2 No

Post New Answer

More Civil Engineering Interview Questions

What are the standard plastic limit/liquid limit/plasticityindex for differrent type of soils?

0 Answers  


Why we add salt in silt content test of sand? Full reason ?

1 Answers   CCCL, JSW,


How to calculate cement, aggregates for any one grade of concrete for icum?

1 Answers   Megha Constructions, MEIL, Student,


design the irrigation canal(b,B,h )head is 3tms of water is supplied to the 200hectars of area and the base period crop is 150days dance to water travels as 35km.the canal section is trapezoidal and also calculate the slop the canal

0 Answers  


What is yield strength of steel?

5 Answers   Mantri,


What is specific gravity???

0 Answers  


What is the difference between Rock And Murrum. How to claim that excavated material is not a murrum but rock.

0 Answers   MTC,


procedure to calulate the how much bag of cement is used for M20 grade?

5 Answers   L&T, NCC, Sahyog,


In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

0 Answers  


in staad which are the point is to be checked for not fail of structure

1 Answers  


Can we use Polystyrene as a Bitumen modifier !! if so is it a good MS research topic ? and what type of laboratory tests will be conducted during Research work ??

0 Answers  


what is mean civil

5 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)