Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What"s mean by term of BOQ in construction?

Answer Posted / jayavijayan k

BOQ means "Bill of Quantities".
Actually the BOQ is submitted by the Design Consultant to
the Contractor. Contractor has to quote the rates for each
items in the BOQ. Then finally the contractor who has
quoted the nominal rate will be selected for the particular
work.

Is This Answer Correct ?    214 Yes 7 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

225 mm thick RCC slab, how many ton load slab can carry? for example if 33 ton truck loaded with soil, truck having 6 wheels. slab can take load or not? grade of concrete is M35 and slab design Fe500, slab desing one way slab.

3340


If we have the center line of the Finnish road level and we want to know what level of pay would have offset the Lhs and Rhus RHS 1,2.5,5 1,2.5,5 m.

1994


Mention what are the composition of a landfill?

1129


How to arrive the co- efficient of all civil activities? For ex:- painting-enamel in wooden doors. co efficient is 1.8. How this is calculated

2153


I have to conduct load test on greting cover, pressure gauge is in kg cm2, how to caluculate load on this greting cover.

2313


Define What is diversion tunnel in a dam?

1240


Thumb rule for steel qty for 1m2 in kg/m2 column slab footing beam

5610


how to estimate material requirement for an area of house in square feet?

2325


all technical question

2254


what is the coefficient for running feet to cft coversion both area and price

2392


manhole height is 1500 mm and width of brickwork is 230 mm dia of manhole covering is 560 mm brick masonry 1:4 horizontal length is 1500 mm and plaster 12 mm thick on both side 1:3. how to estimate the quantity of brickwork with mortar cement and sand for manhole chamber.

2070


where i can get material costs on weekly basis

2151


How does a traffic light signal work ?

2288


What is semirigid connections?

2140


Define Workability ?

1243