how to find the carpenter work per day? how many cubic feet
they should be work per day?
Answer Posted / harish
average one carpenter one helper they give out put of 12-
14m2of shuutering
| Is This Answer Correct ? | 4 Yes | 10 No |
Post New Answer View All Answers
please, what is the required bar for a column of 6mx6m the dept is 405mmx300mm,its an axially loaded ?
Can rice husk ash be used instead of coal fly ash for manufacture of clc/ foam concrete
What is the purpose of the gap in the road on this bridge?
important question on stones
Ratio for 4500 psi concrete
Normally in slabs, steel quantity is not added when you calculating concrete quantity for that slab, why it is not added ?
What are the main reasons for conducting pull-out tests for soil nails?
How will you reduce the concrete flow after mixing the concrete
How to find permissible diagonal tensile stress in reinforced brick work
what's the formula for calculate pcc for matt(45mm aggregate)?
What is the nature of duties & responsibilites senior civil engineer ?what is self confident & satisfaction should be a senior civil engineer?
How can you produce desired alloys and discuss their applications in daily life.
1m square 20mm plastering how much of water need curing work
1) write Short notes about Shellow & Deep well? 2) What is the full form of SPT & SMB? write short notes. 3) write short notes about efficiency of Riveted joint.
What is dead load impact load live load