Why joints are provided?
No Answer is Posted For this Question
Be the First to Post Answer
If the design CBR of subgrade is 10% but the material available on site is 30%.will you compact less(like 90%) where you get desirable CBR(10%).
What is the purpose of the gap in the road on this bridge?
How steel required for 823 sqm of flooring work in 150mm c/c in single jali?
PL.tell me about civil engineering questions with answer
What do you mean by the word 'shear'?
What is the nature of duties & responsibilites senior civil engineer ?what is self confident & satisfaction should be a senior civil engineer?
how to calculate concrete quantity for footing using M25 grade 1:1:2 for 730cft.
mix design procedure for 1:6 cement mortar
What is pile foundation?
Define What are the reasons for geotechnical site investigations in Uganda?
What is the biggest dam in america?
How to calculate cut length of square shape stirrups?