how to find the carpenter work per day? how many cubic feet
they should be work per day?
Answer Posted / geethu
i hav asked about wood carpenter output?(doors,windows)
| Is This Answer Correct ? | 0 Yes | 3 No |
Post New Answer View All Answers
1.what is the mix proportion for cement soil compressed earth blocks? 2.how to calculate the mix proportion for cement stablised earth soil blocks?
Which is the direction for positive angle?
For plate load test why we are applying pressure 3 times the proposed allowable bearing pressure? Is there any supporting standards for this?
How many days should curing of plastering, brick work and concrete
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
Pls provide me with the calculation or codes related to de- shuttering of flat slabs
how to identify the failure of building by expansive soils
what is diversion?
how can calculate the compressive strength of concrete cylinder by water cement ratio ?
Suppose you planning to paint newly fabricated workshop building made of structural steel of 10 tons total mass. How many litters paint primer for 1 coat and 2 coat of top coat?
Formula for calculating the volume of bulb in underreamed pile
what is the design procedure for building
Why M15 is replaced by M20 when ammendment are made in IS456 in 2000?
How to calculate unit weight of concrete for m40 grade.
What is the meaning of Brick- M 35 grade? Is it a common brick or it's a concrete brick?