how to find the carpenter work per day? how many cubic feet
they should be work per day?
Answer Posted / geethu
i hav asked about wood carpenter output?(doors,windows)
Is This Answer Correct ? | 0 Yes | 3 No |
Post New Answer View All Answers
PL.tell me about civil engineering questions with answer
How to calculate the cement and fine aggregate requirement for solid block masonry works in terms of Sqm. 1. 400x200x200mm 2. 400x200x100mm 3. 600x200x100mm 4. 600x200x200mm I need the answer for 1 Sqm of solid block works.
Describe a time when you anticipated potential problems and developed Preventive measures
How many are the types of joints?
rcc floor to floor 4m. in column reinforcement where we provide lap in exact location.
what is Short bored pile foundation.
How do you measure concrete?
How many axes do cartesian coordinate system has?
How many square meter can a worker/labor demolish a structure per day?
what are the grades of concrete?where and or what purpose a particular grade is used in a particular structure?
Time required for curing of wall tiles before fixing
150mm bricks size how many use 4.14 m3
the volume of cement req for 70cum of brickwork in 1:6 cement mortar is approx is equal to 3cum 5cum 7cum 1ocum
how to calculate the density for high density concrete ? or is it same as the density of RC?
Dear sir, i want to NBCC & NTPC previous exam papers email Id : madhu_bingi@yahoo.co.in