how to find the carpenter work per day? how many cubic feet
they should be work per day?
Answer Posted / nagu
1 carpenter 2 helper 4 to 6m2 per day so 8hours
Is This Answer Correct ? | 3 Yes | 1 No |
Post New Answer View All Answers
Can rice husk ash be used instead of coal fly ash for manufacture of clc/ foam concrete
how the calculation occurs if i want to mix 1cum of M50 concrete. please calculate every ingredients with detail calculation.
Differentiate first angle & third angle projection?
psc girder detail
How do you calculate load bearing capacity of a waffle slab?
In block work seawalls what is the purpose of slip joints?
what is the formula to find the sttel (bar)length in beam having bent up at l/4 t 45 degree & 60 degree.
What is the standard volume of pharma in cub ft
Why Is Propping Required For Long Structures Once The Form Work Is Removed?
150mm bricks size how many use 4.14 m3
In csae of hume pipes NP stands for Non Pressure bur what does it really mean?
What things architect have to take care of before starting any project?
I am called for interview from north east power plant .so, I need some interview question which may help me.
What is GSB gradation
how to calculate the mortar for 10'*10' size room for both plastering and for masonry work?