how to find the carpenter work per day? how many cubic feet
they should be work per day?
Answer Posted / nagu
1 carpenter 2 helper 4 to 6m2 per day so 8hours
| Is This Answer Correct ? | 3 Yes | 1 No |
Post New Answer View All Answers
What is meant by a context menu in a cad software?
How much cement is require in one sqft area in a G+3 residential construction.
how to disign cuplock shuttering and it's matireal requirement snd any related web site
How to calculate the cement plastering for circular and rectangular water storage tanks and how to calculate the area of circular and rectangular floor?? Please help me
detailed calculation of the amount of cement used?
Whats be the minimum foundation depth of multistoried building as per height of building in individual footing?
what is tension & compression of steel bending.
five requirements of infill panels for walls?
how to determine the correctness of proportion used in cement mortor and various IS codes to determine the same?
What is difference between limit state and working stress method? How it is applies in building structure.
How to do base isolation using ETABS software?
What is the quantity of cement in mix m20 concrete?
what is difference between NP2 NP3 NP4 CONCRETE HUME PIPES USED AT SITE
HOW SOON CAN YOU TRAVEL DON TO ANY LOCATION POSTED U?
what is high type road and low type roads