how to find the carpenter work per day? how many cubic feet
they should be work per day?
Answer Posted / girish rawat
ON AN AVERAGE 1 CARPENTER I SEMI SKILLED CARPENTER AND 1
HELPER WITH GIVE YOU AN OUTPUT OF 10 TO 12 M2 OF SHUTTERING.
IT DECREASES IF YOU ARE FIXING BEAM BOTTOM OR STEP FOOTING.
IT INCREASES DURING COLUMN FIXING AND SLAB DECK SHUTTERING.
Is This Answer Correct ? | 45 Yes | 3 No |
Post New Answer View All Answers
1) What is meant by C-soil in geotechnical Engineering? 2) What is Eve board? 3) What will happen when heat is applied to cement? 4) what do you understand by the lateral dimention ?
how do i remedy a foundatiom that the column bases was cast and aftet 28days crushing the conprehensive strength of the concrete fall below the specification 25N/mm2
what is escalation?how it is done?
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
Are you ready to relocate with your immediate family to United States as a new employee?
What is costing in 100squre feet bricks
can we use PPC for concrete wall, If yes, what is the concrete (PPC & OPC) grade for Non- load bearing concrete wall, load bearing concrete wall & for cellar retaining wall.
what is right & short method of measurement of slab&beam
How many times we can use Fresh bentonite ford wall execution? Would like to know the clear concept of recycling. After flushing can we use it for another time time for flushing? Or we have to use it for for excavation only?
TO CONSTRUCT A 1800 SQFT CAPACITY UNDERGROUND WATER TANK HOW MUCH CUFT CONCRETE IS REQUIRED AND HOW MUCH REINFORCEMENT IS REQUIRED. FOR COSTING
How to find coloumn vertical cut length floor to floor & lap + bend or anything plz clearfiy
How to calculate the weight of sand am 20mm course aggregate in 1 c.m M25 concrete Which use 400 kg of cement ?
Define block?
what is the design procedure for building
What are the strongest shapes in building?