What are the steps required for integration between MM and
SD?
Answers were Sorted based on User's Feedback
Answer / amalesh
obyc is the integation between MM & FI.
For SD - MM integration - STO with SD delivery & CIN for
Depot config etc.
Is This Answer Correct ? | 7 Yes | 1 No |
steps involved in mm and sd integration
1. maintain sales org
2.maintain distribution channel
3.maintain sales office
4. main sales group
5. maintain division
assignments
sales org to company code
sales org to distribution channel
div to sales org
set up sales area ( sales org +distribution channel + division )
sales office to sales area
sales group to sales office
sales org +distribution channel + division
shipping point to plant
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / ram
Use T-Code OBYSC you will find the answer moreover ,The
results represents link b/n valuation class,chart
accounts,inventory posting etc., of MM to linking General
Ledger account for FICO
Is This Answer Correct ? | 0 Yes | 16 No |
SAP MM ON LINE TRAINING AND CLASS ROOM TRAINING
Is it possible to have scales in a quotation?
Can anyone give an overview on Account Determination?
Explain 'prices maintenance' for materials transferred from 'legacy' to sap?
After creation of schema procedure ,In vendor master i assigned the vendor scema in Puchasing view.Then i creted a PIR and assigned the condtions and saved.Then in ME12 when i have deleted those condtions,Net price field in Info Record became empty with greyout.if i want to retain my previous Net price value How should i proceed????In FSG for ME12 optional entry is checked.Plz guide me.
3 Answers Unisoft Infotech, Wipro,
What mrp procedures in consumption based planning?
How many stock transport orders available in sap system. And how to configure stock transport orders?
What are all the various types of 'physical inventory'?
How is an item with serial no. managed?
What is meant by a release strategy?
Is it possible to have scales in a quotation?
Where does moving average price is used in sap mm? Is it used in po or pir or contract?