what is the weight of 8mm dia steel with 1 meter length.
Is there any formula to calculate the weight for any given
diameter
Answers were Sorted based on User's Feedback
Answer / stavros siamantas
Firstly, you need to evaluate the section area of your beam.
If the section area is a cicrle, then:
A=(1/4)*π*d^2 -> A=(1/4)*3.14159*0.008^2 -> A=5.026E-05 m2
Then, in order to acquire mass per running length, you just multiply the section area with the density of the subject material. In our case, ρ_steel=7850kg/m3.
So, we get: W/L=A*ρ_steel=5.026Ε-05*7850 ->
W/L=0.3946 kg/m
Multiplying with the length of our beam (1m in our case), we get W=0.3946kg.
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / shaikh soyal
formula For finding weight of bar = (D^2/162)*L
so,
wt. of bar=(8^2/162)*1 = 0.395061728
aproxmetly =0.4kg
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / umesh singh
8*8/162=.395kg
D*d*/162=1mtr length, weight showing
| Is This Answer Correct ? | 0 Yes | 3 No |
Answer / sanjeev jain
The weight/m of an 8 mm rebar is 0.395 Kg/m.
For calculating the sectional weight of steel rebars/
circular sections with ease, use this formula:
Dia(mm)/10* Dia (mm)/10 * 0.616 = Weight in Kg/m
For example 32 mm rebar shall have:
3.2 * 3.2 * 0.616 = 6.307 Kg/m
| Is This Answer Correct ? | 19 Yes | 25 No |
which lime used in white washing
Cement consumption of one cubic meter of aerocon blocks masonry?
0 Answers Sathiapal Engineers,
rate of 1cum brick masonry please immidate
While calculating quantity of cement required for 1 qubic meter If mix is m25 1:1:2 =4 1.52/4=0.38, 0.38x1440=547.20 kgs I know 1440 is unit weight of cement And what is 1.52 ? And some one using 1.54 and 1.53 etc... Why they are using can u explain me what is 1.52, 1.53, 1.54?
How we can calculate the cement, sand,bricks , water , quintity in 1:6 Ratio 1 cubic metre b/w and 1:4 Ratio in 1 Squre metre b/w????
IN Compression testing machine 1division =10KN ,then what is compressive strength of 100*100 mm cubes at a load of 320 KN
Respected Sir, I am from a hilly place called Darjeeling ,I have constructed house of 9 column out of which 4 of the column is under water , i have put rcc slab on top and on top of the rcc slab i have construced two room house with bricks and light roof , now i am planning to change the light roof with rcc slab for the two room, my main concern is will the column under water will hold the load of the new rcc slab coz it already 10 to 12 yrs old , i dont know what to do , can u advice me regarding this matter, weather to leave the upper floor roof light or make it rcc slab.(If i put the slab , it will require 45bags of cement and u calculate how much of steel and sand and pebbles) thanks with regard Anand
why we use aggregate,sand with cement in concrete?
what are the major benefit in auto level?
How to defind P.C.C. mix design according ratio & IS coad
How many mortar required for Brickwork of 1 Cu.m works??
what is period of de-shuttering for different area of slab of M25 grade?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)