how to build a network which step down 415v to 1v rms
No Answer is Posted For this Question
Be the First to Post Answer
How to do maint. Of busbar.
What is Ten Delta Test ?
In single core cable, Why non-magnetic material is used??
why use phase displacement in transformer.and effect of phase displacement on transformer
from 33kv to 440v 2mva transformer how much full load current will be at ht side and lt side and which range of ctpt will be used?
As per the theory current doesn’t flows in Neutral, but practically it is not applicable, explain why?
How would you relate your key competencies to this position?
how did the testing of protection relays done through current injection
how to test YNyn0 vector group in transformer?
An ISP is granted a block of addresses starting with 150.80.0.0/16. The ISP wants to distribute these blocks to 2600 customers as follows. a) 200 medium size businesses; each needs 16 addresses b) 400 small businesses; each needs 8 addresses c) 2000 households; each needs 4 addresses Design the subblocks and give the slash notation for each subblock. Find out how many addresses are still available after these allocations.
IN THE CASE OF AN ELCB, IF THERE IS ANY UNSTABILITY BETWEEN PHASE AND NEUTRAL IT MAY TRIP. BUT MY QUESTION IS WHEN A LOAD IS CONNECTED IN BETWEEN P AND N, THE LOAD CONSUMES SOME POWER AND THERE IS A DIFFERENCE IN NEUTRAL WITH RESPECT TO THE PHASE. THUS ACCORDING TO ME, THE ELCB WILL AUTOMATICALLY OPERATES WHEN EVER THE LOAD CONSUMES-- I KNOW IT IS WRONG. BUT THE SOLUTION IS?????????
surge tank, hrc fuse, earthing transformer, firm power objective type