Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


why an ac solenoid valve attract the plunger eventhough we interchanges the terminal?will the ploes changes?



why an ac solenoid valve attract the plunger eventhough we interchanges the terminal?will the ploes ..

Answer / nithi

yes.The poles changes for every half-cycle of ac voltage.

Because the polarity of AC voltage is continuosly
changing for every half cycle.
so, interchanging of terminals in ac system
does not show any difference.That's why the ac solenoid
attract the plunger eventhough it's terminals are
interchanged.

Is This Answer Correct ?    6 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

how many typetesting of transformers?

8 Answers   ONGC,


corona happens more in ac or dc?

5 Answers   MAHINDRA,


3.The slip of an IM UNDER FL condition is about.....

1 Answers   SSC,


Why oil preferred over the air as a cooling medium for high rated transformer?

1 Answers  


what is the minimum voltage require to injure our body?

4 Answers  


how to calculate power consumption in slip ring motor at different step

0 Answers   ABB,


In our generating power station we get electric shock in the battery bank, what will be the reason?

3 Answers  


why ct's&pt'S out put called as burden,why compelsary short ckt the secondary of ct's while removing the burden?

0 Answers  


A group of machines (wind turbines) connected with 33KV feeder and each machines are having individual VCB. The 33KV feeder connected with 110KV/33KV substation. The 33KV feeder tripped by over current at Substation and fault recorded at Substation as OC-R&Y phase. Same time the group of machines VCB tripped by over voltage, the fault recorded voltage was above 66KV by numerical Under/Over voltage relay. While grid drop time, this much of voltage hike is possible?

1 Answers  


what is the circutor?why we use it ?

0 Answers  


How do you select a cable size(cu and Al) for a particular load

6 Answers   Pepsi,


what is the meaning of 0.5ohm Resistance

0 Answers   Vardhman,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)