Answer / suresh
let the total volume of the concrete is = a
and let the given mix proportion is 1:1.5:3
then the quantity of the
cement required = a*(1.52/(1+1.5+3))m^3 = x m^3
we know that one cubic metre = 1450kg = 29 bags
1 cubic metre = 29 bags
x cubic metre = ?
=(x * 29)/1 bags
now, fine agg = 1.5*x
coarse agg = 3*x
| Is This Answer Correct ? | 36 Yes | 9 No |
Answer / brajesh kaurav
let the total volume of the concrete is = a
and let the given mix proportion is =1:1.5:3
then the quantity of the
cement required = a*(1.57/(1+1.5+3))m^3 = X m^3
where 1.57 is loose volume of 1 cum concret.
we know that density of cement = 1440kg/cum
quantity of cement in per cum in bag=1440/50=28.8bag/cum(in
loose volume it consider 30bag)
1 cubic metre = 30 bags
x cubic metre = ?
=(X*30)bag/cum
now, fine agg = 1.5*X(+5% of voids)
coarse agg = 3*X(+1% of voids)
| Is This Answer Correct ? | 10 Yes | 8 No |
Answer / jumrik ngomdir
let the total volume of the concrete is = a
and let the given mix proportion is =1:2:4
then the quantity of the
cement required = a*(1.52/(1+2+4))m^3 = (X) m^3
where 1.52 is loose volume of 1 cum concret.
we know that density of cement = 1440kg/cum
quantity of cement in per cum in bag=1440/50=28.8bag/cum(in
loose volume it consider 30bag)
1 cubic metre = 30 bags
x cubic metre = ?
=(X*30)bag/cum
now, fine agg = 2*X(+5% of voids)
coarse agg = 4*X(+1% of voids)
| Is This Answer Correct ? | 4 Yes | 2 No |
50 acre of land to be reclaimed for an average height of 2.5 mt. Dredging area is 500mx200m size. what is the dredging depth required to reclaim the area?
1)pile is of 200mm dia.-- a)tell the cutting length of ring considering 2cm cover b) tell the quantity of concrete considering pile length as 3m c) tell concrete quantity in bulb
what ratio of cement and sand we used for making cover
What should be the required steel in column, beam and slab
how quantity of much blocks, cement and sand is required to complete 1sq.m of CC Hollow blockwork
How can i design the beam . Explain with one example
manhole height is 1500 mm and width of brickwork is 230 mm dia of manhole covering is 560 mm brick masonry 1:4 horizontal length is 1500 mm and plaster 12 mm thick on both side 1:3. how to estimate the quantity of brickwork with mortar cement and sand for manhole chamber.
procedure for preliminary selection of size of column of 5 storey building
Name the standard sand for concrete tests
how to the steel dia without using d2/162
how can calculate cutting length of diamond ring
any one tell me what is the volumetric ratio and weigh bathing ratio of 6000 psi concrete. plz help me on this matter.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)