Aptitude, reasoning, quants, verbal and technical question
No Answer is Posted For this Question
Be the First to Post Answer
why the compressive strength of concrete is calculated only after 28 days.why not after 25, 26,27 days..
What is mix design
Is it worthwhile to carry out tests on particle density of soil particles for geotechnical design?
What is construction mitigation management?
for construction of 1 cum of brickwork what is requirement of cement, sand and bricks
3 Answers Nirman Consultants, Shapoorji Pallonji Group(SPCL),
what is singly & doubly rc beam? what is difference between them?
what is RFI.How to prepare for slabs and beams connecting works to be executed.give order of work to be done.
why is M30 grade Concrete use for Foothing & Column M50
how much should we assume for the weight of foundation ??
What will be the exam pattern and syllabus for j.e post of haryana staff selection commision? Advt no. (02/2015) Some people says it would only be objective type question papers while others say it would be same as ssc (1 objective,1 conventional) ?? Please answer this question it is needfull to all.
how to calculate required shuttering material like props,spans,plates ..etc for a slab?
1 Answers NCC, Shoba Devlopers,
Why we do design mix of concrete when there is nominal method using the IS-Code available ?
14 Answers Engineers India Limited,
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)