What are the precautions needs during concrete pouring in
very hot weather?
Answer / ratheesh
1. Concrete pipes should be roll with gunny bags and its wet.
2. Put some ice cubs in RMC vehicle
3. RMC vehicle silo should be roll with gunny bags and its wet.
4. Construction of concrete should be pour in the evening.
5. Dont mix more admixtures...
| Is This Answer Correct ? | 5 Yes | 0 No |
how can we calculate the amount of concrete in trapezoidal footing?
what is the difference between ribbed steel & tor Steel ?
why did you choose this career
Can someone please be curing period of the following according to IS codes Column beam slab brick masonry raft found. and also tell how many hours/day
why steel is used in r.c.c why steel is used in r.c.c
very simple or less time consuming formula for reinforcement calculation by moment
how to compute slab reinforcements on step by step procedures??
How do you calculate qty for form work like props shuttering sheet and acro span for residential block ? for Example: 10 sq mt what is the material and qty require to do form work.
where you provide overlap on column?
how much binding wire required per tonne slab beam columns
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting?
how many express way in india
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)