At what load maximum effiecency will be obtained
Distribution transformer and Genarating transformer Pls
clarify?
Answers were Sorted based on User's Feedback
Answer / sandipan
In case of distribution transformer max efficiency occurs
in 50% load.Because it is never fully loaded(vary from day
to night). Therefore,it is designed so that it's max
efficiency occurs on below full-load/around 1/2load.
In case of Genarating transformer max efficiency occurs in
full-load.Because it is always fully loaded. Therefore,it
is designed so that it's max efficiency occurs on full-
load.
| Is This Answer Correct ? | 14 Yes | 4 No |
Answer / sanjay kolambekar
For Distribution Transformer it is at 50% load
For Generator Transformer it is at 95% load
| Is This Answer Correct ? | 7 Yes | 1 No |
Answer / iamdon
Distribution transformers are designed to give maximum
efficiency at around 50% of rating.Where as generating
transformers are designed to give maximum efficiency in the
range of 75-80 %
| Is This Answer Correct ? | 3 Yes | 5 No |
Answer / mahmoud amin
For Distribution Transformer it is at (50% to 80%) load
For Generator Transformer it is at 95% load
| Is This Answer Correct ? | 1 Yes | 3 No |
why when i start my diesel generator it takes 1 minute or less then stop, and i checked the oil sensor is ok and when the generator start i can get 220 voltage but it it is stop after 1 minute or less, how can i solve this problem?
All the voltage drops and the source voltage added together in a series circuit is equal to
what is the diff. btwn. electronic regulator and ordinary rheostat regulator for fans?
What are the advantages & disadvantages of a group electrive drive?
why we use Bus earth truck and Cable earth truck
HOW MANY EARTHINGS REQUIRED FOR GENERATER
In what way does the variable ratio-arm improve the usefulness of the wheatstone bridge?
What is means by MacAdam Ellipse?
how can we calculate cable size
3 ph motor connected in star delta starter. when we start the motor it run in star but when in is going in delta it trips the main incoming supply. why?
I am going to appear for the RRB Chennai Section Engineer online exam. Please send me the question papers from 2001 to date to my mail id:upendrakrishna20@gmail.com,plz send me ,or send any other rrb papers plzzzzzzzzzzzzzzzzzz
What is the tests required for a 132 kV, 400 kV , 765 kV for a Circuit Breaker and Power Transformer before commissioning ?
0 Answers Eprosys Engineering Consultants,
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)