1. allingment
2. plumb
3. properly fixed
5. type of joints
6. fixing of masala in joints
| Is This Answer Correct ? | 13 Yes | 2 No |
Answer / nitin ghamdayan
plaster margin both side ,line and level
| Is This Answer Correct ? | 3 Yes | 0 No |
Answer / tarun vashist
to check the door n
window is in soul.
to check hole pass is
fixed proper .n plaster
margin also take.
| Is This Answer Correct ? | 1 Yes | 0 No |
what is meant by civil engineer?
how much binding wire is reqd for 1 MT
about higyway engineering
Difference between Hydro Pneumatic and Gravity system of water supply in a building?
what is meant by structural design
please help me to find a mix design ratio for M40....
What is reinforced concrete?
what are the various types of pile foundation? explain with introduction
What is the roll of face bars in beams
How to calculate material and labor required for 100 m2 plaster?
What is a BBS?Find out the cutting length for a 300*300 column with 40 mm cover?
21 Answers L&T, SSC,
How to Know that veriation acceptable in CPWD Work Of 1:6 Cement Mortor Received Lab test report.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)