How do you prepare Material Recovery Statement for deduction from contractors bills?
No Answer is Posted For this Question
Be the First to Post Answer
What is the difference between chamfer and fillet?
best hand book for civil engineers with practical criteria
is there zone 6 for earthquake in india? on what basis the naming of the zones are done in variuos countries?
advantage and dis adventagesof using crusher dust insted of sand in rcc works
what is the formula to calculate isolated footing
19. Are you a team player?
What is the benefit of making a cantiliver proped.?
7 Answers CCCL, Engineers India Limited,
What is the wastage % of concrete in Conventional shuttering design & Mivan Shuttering for high rise building.
the size of one block is 390mm×190mm×190mm.then how much block will required for 4.6m × 3.4m wall.the thickness of wall is 190mm
can any one explain structural behaviour of trapezoidal combined footing?
What is the use of mirror command?
in 1:4,1:6 and 1:8 cement mortar mix how much water required? and find water cement ratio?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)