what are the checks to be performed while fixing a door and
a window frame..at site??
Answer Posted / sjtbehera
1. allingment
2. plumb
3. properly fixed
5. type of joints
6. fixing of masala in joints
| Is This Answer Correct ? | 13 Yes | 2 No |
Post New Answer View All Answers
How many are the types of joints?
the magnitude of the buoyant force can be determine by newtons law of viscosity archimidies principal principles of momemnt none
Which condition will prevail for the design of a swimming pool ? When the pool is empty or when it is filled ?
how much cost of single coat 20mm thick plastering per sqre meter
Explain what is progress payment?
how to reduce size of column 450 x 750 to 230 x.... if it is cut in area of bathroom? means it appears in bathroon any shifting or any other option....building is g + 10 and the bathroom is at first floor...
How did the romans get water up hills using aqua ducts?
What in your opinion makes you the most suitably qualified candidate for this post of civil engineering technician?
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting?
acceptance criteria for concrete works
Explain what is change order request?
What is portland cement
1.what type of the rock is most suitable for wet mix macadam in construction of road? 2.what is the highest maximum dry density and optimum moisture content can be acheive by using most suitable crush rock?
manhole chamber having height of 2300 mm and thickness of brickwork is 230 mm and dia of opening covering is 560 mm and bottom length vertical is 1500 mm (1:4) brick masonry and plaster 12 mm on both sides..how to estimate the no bricks used with mortar cement bags and sand for total chamber including plaster.
In which code the the maximum height of concrete casting has been explained