if water absorption is more than 25 percent in brick, what
is the defect in it?
Answers were Sorted based on User's Feedback
Answer / sjtbehera
Water absorption is more than 25% in brick, Bricks are not
properly burnt have many voids in it for that seepage is
very high. it easily breakdown.
Is This Answer Correct ? | 22 Yes | 0 No |
Answer / d v n potharaju
If the percentage of absorbtion exceeds 25% ,it indicates
that the brick is more porous and less in weight and could
not attain the required specific weight of 1920kg/mt3
Is This Answer Correct ? | 13 Yes | 0 No |
Answer / sagar sontakke
If water absorption is more than 25 % in bricks,it will
absorb the water from the mortar,making mortar dry.so
mortar will become weak and so the massonary.
Is This Answer Correct ? | 6 Yes | 3 No |
how many bags 0f opc cement in 1 m³
Sometimes the side of concrete bridges is observed to turn black in color. What is the reason for this phenomenon?
how to take concrete quantity for precast segment for viaduct project?
what is the sp.gravity of sand?
Required Qty of Cement Mortor for 3"x3"x1' groove filling?
What is the difference between solids and fluids, in terms of their ability to resist force?
what is the formula of calculating number of bars?
1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.
What are the standard plastic limit/liquid limit/plasticityindex for differrent type of soils?
What is the mix propotion of M10,M15,M20,M25,M30,M40,M50.M60 cement content,aggrigate,sand and water ratio.
In footing (mat) if two different dia of rods are to be used which rod should be placed at top and bottom ( eg. 10mm & 16mm dia rods)
What is creep ,deflection and shrinkage in concrete