if water absorption is more than 25 percent in brick, what
is the defect in it?
Answer Posted / sjtbehera
Water absorption is more than 25% in brick, Bricks are not
properly burnt have many voids in it for that seepage is
very high. it easily breakdown.
| Is This Answer Correct ? | 22 Yes | 0 No |
Post New Answer View All Answers
What is the tensile strength of marble?
how to conversation of all construction material in to brass
Define What are the reasons for geotechnical site investigations in Uganda?
what is spacing of wallar support of 3m column. the thickness of column is 0.25 m.
what is yield and tensile strength of steel, if steel has yeilding strength of 60 psi than how much its tensile strength?
what is the steel difference between np-2 and np-3 pipes and weight also
what is the cost difference of a same structure when it is constructed with brick masonary and when it is constructed with block masonary and concrete as a frame structure????????????????????????
how to calculate cut length of re-bar in a circle . because we not place same length of re-bar in whole circle maximum in center and minimum at corner so how to calculate middle bars???
Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?
04. a. Slenderness ratio…………… 1 b. If the height of a stage is 15-0 & dia. of the prop is 5, the slenderness ratio is….… 1 c. If the height of a stage is 10-0 & dia of prop is 3, the number of bracing will be…… 1
How to do bbs in excel format
Required amount of Steel bars, cement/ square feet for roofing of residential building upto 3rd floor.
What is the standard volume of pharma in cub ft
How much for the BRC lapping in full yield and half yield < and which table to get it ?
In Residential home construct footing,beam, column,lintel,rcc roofs which dia rod used how to self assumed