Answer / k.prakashchandra

contract demand is also called billing demand and it is not
likely to be exceeded by the consumer.It is the assured
maximum demand.Max demand is the actually recorded one
during the month and the consumer will be penalized if this
exceeds the CD as per applicable rules formed by the supplier..

Is This Answer Correct ?    61 Yes 8 No

What is maximum demand and contract demand?..

Answer / keshava prakash

Contract demand is the demand(load in terms of KVA/MVA)
based on the customer requirement with power supplier as
per the supply agreement. Maximum demand is the maximum
load recorded during the billing cycle (usually a month)as
per the power supplier. Billing demand is the demand
charges billed by the supplier based on maximum demand
recorded and contract demand. It varies depending on the
power supplier. For example in Karnataka state all
Electricity Supply Company under Karnataka Power
Transmission Corporation, bills based on 75% of the
contract demand or maximum demand recorded whichever is
higher in a month.

Is This Answer Correct ?    37 Yes 1 No

What is maximum demand and contract demand?..

Answer / pepepy

Contract demand is the demand where we are making contract with government that we will not cross the value of contract demand.
Maximum demand is the demand where we are utilizing the electricity maximum on a particular time period.

Is This Answer Correct ?    10 Yes 0 No

What is maximum demand and contract demand?..

Answer / harsh patel

Contract demand is the total power (KW or KVA) required by the customers and written agreement done with supplier.while maximum demand is the peak load recorded for intervals of some particular time such as 15 minute or 30 minute.

Is This Answer Correct ?    2 Yes 0 No

What is maximum demand and contract demand?..

Answer / s t gokhale

I think ,span of time for which the maximum power is used is also important while defining contract demand. In Maharashtra state, maximum demand for a continuous span span of 30 minutes is recorded in the meters and billed as contract demand.

Is This Answer Correct ?    0 Yes 6 No

Post New Answer

More Electrical Engineering Interview Questions

77 In constant power region of 3-phase IM torque-speed characteristics, the torque is proportional to A speed B slip C 1/speed D 1/slip

1 Answers  


what kelvin's law ?

0 Answers  


Which motor is suitable for mixer grinders.

12 Answers  


we erected (48HP)63kva dist transformer and incoming from 11kv line,out going is 415v domastic line 2.04 km.for that actual output current is 84A. what are the losses and final output current.

3 Answers   Essar,


What are the different types of cable jointing methods for HT and LT power cable?

1 Answers  






IS it possible for a feedbacksurge to travel over a wireless connection?

1 Answers   HP,


is it possible to flow a current between nutral and earth in a circuit? although nutral and earth having same potential diffrence? i=0/r=0A if any body now any solid reason because i am getting a triping problem in rcbo due to nutral and earth shorting???

2 Answers  


why use in & out Diesel line in dg set.

1 Answers   NHPC,


33kv Rated output avilable in market (any where in india)

0 Answers   C2C,


what is ring main unit(Rmu)? what is its function

1 Answers  


What is the basic principle of operation of alternators/dc generators?

0 Answers  


why power generated only 11KV not more than???????? and why power up/down is multification of 11*?=??.??? foe Example 11/33,11/66,66/11KV etc,

8 Answers   Essar,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)