Answer Posted / harsh patel
Contract demand is the total power (KW or KVA) required by the customers and written agreement done with supplier.while maximum demand is the peak load recorded for intervals of some particular time such as 15 minute or 30 minute.
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
if 12v battery get discharged for 2 months after if we put charge it will charge again?how much time it will take to charge?
What are the insulation standerds for eg H clase and how many insulation standerds are there and its standerds??????
how could we know the size of cable by physical view?
what are pilot cells
What conditions are required for transformer to operate at low frequencies ?
how point on wave controller works.
The series field winding has low resistance while the shunt field winding has high resistance. Why?
what is the clear formula to calculate cable size for a load
How can we calculate the KVA rating of a Distribution transformer from its core details?
What is the maximum No. of out going mccbs permitted from an LV distribution paqnel? What is the ampere relation between incomer and out going switch gears/mccbs?
How to improve fuel cell in a distribution system?
I have a current transformer with 1 main reading meter with transformer outside the building and a control panel having 5 CT reading meters with black round coils inside the building. I want to know, A) when current pass through the Transformers, will the current be reduced or be the same and after that B) when current pass through the CT meters with black round coils, will the current be reduced or be the same. C) in the above process will the reading of the main meter be same or different, from the total reading of all the 5 CT meters.
what is the min and max ohmic resistance for the earthing rod installed for lighting poles for street light network
briefly explain the main blocks found in a microprocessor based system
I want single line diagram for AMF & DG syncronizing panel