Answer Posted / keshava prakash
Contract demand is the demand(load in terms of KVA/MVA)
based on the customer requirement with power supplier as
per the supply agreement. Maximum demand is the maximum
load recorded during the billing cycle (usually a month)as
per the power supplier. Billing demand is the demand
charges billed by the supplier based on maximum demand
recorded and contract demand. It varies depending on the
power supplier. For example in Karnataka state all
Electricity Supply Company under Karnataka Power
Transmission Corporation, bills based on 75% of the
contract demand or maximum demand recorded whichever is
higher in a month.
| Is This Answer Correct ? | 38 Yes | 1 No |
Post New Answer View All Answers
We have two parts in generator, electrical & mechanical. how it works?
what is high and low cut off voltage of BB and DG at SPS????????
what is the use of piston rings in the engine used for a generator...........
what happens when dc generator coupled with cycle shaft.also explain what happens when its loaded
how to calculate the fault in substation
what will happen reduce the transformer voltage from 415v to 406v, is it save the energy,? are this methodis good to reduce the energy.?
what's the simultenous maximum demand (SMD)..what the diffrent MD and SMD?
What are the types of windings present in the ceiling fan? What winding will be effective first when we started the fan?What are the resistance and inductance ratios comparatively at the initial speed and full speed of the fan?
If two Transformers are connected in parallel having impedance of 50KA in both transformers will the impedance increase or decrease after connecting transformers in parallel?
what are the different sizes of U.G. cable & where these cabl;es are used according to voltage ..
How you give clearance to a spare feeder.
salam&hi, i need to know about how can i calculate an enough current for the new building before i submit it to the suppliers
Hi Friend I am used multimeter to measure the voltage between R Phase(SS1) to R Phase(SS2). In SS1 is connected with UPS loads. But I am getting voltage between these 2 R Phases. Please give some idea friend
how much UPS neutral erath leakage current.
Dear sir, I have completed DECE in the year 1995. I have work experience in HT and LT LINE more than five years. Now i am doing BE in EEE from rajasthan university. After completion of BE,can i apply "C" Licence sir? Please reply.