Answer Posted / keshava prakash
Contract demand is the demand(load in terms of KVA/MVA)
based on the customer requirement with power supplier as
per the supply agreement. Maximum demand is the maximum
load recorded during the billing cycle (usually a month)as
per the power supplier. Billing demand is the demand
charges billed by the supplier based on maximum demand
recorded and contract demand. It varies depending on the
power supplier. For example in Karnataka state all
Electricity Supply Company under Karnataka Power
Transmission Corporation, bills based on 75% of the
contract demand or maximum demand recorded whichever is
higher in a month.
| Is This Answer Correct ? | 38 Yes | 1 No |
Post New Answer View All Answers
How to minimize the eddy current losses?
what is transient voltage?
What type of DC motor would you see for a lift?
will there be any problem by recovering slip from single phase induction motors?
The shot circuit in any winding of transformer result? Explain
what is the difference between transformer,converter and transducer
If the Brush of DC motor is shifted by 90 deg, then what happens to voltage and torque? Both voltage and torque are zero. how to justify the answer?
hi, in the event earth grounding is not available in a project, is there any other way to make the elcb work? fyi, i have an instant water heater (6.5kw) installed, however if there is grounding in the heating element inside the heater assembly, i will get grounded. thank you in advance to those who will answer my question.
Briefly describe means used by electricity suppliers to influence the flow of active and reactive power in power networks (one for each type)?
l&t switch FN 63 handle position can we change
What is resistance reading of earth copper rod with grid and without grid?
we can run 2phase as 3phase .what will be the differnce with respect to phase angle, power, current between the two modes
What is the function of under voltage release ?
How much of the total hydro power potential has been exploited so far in india?
any earth foult trip the relay but in welding time not trip by earth foult