can we transport requests from production to development for
client copy using scc8?
Answers were Sorted based on User's Feedback
Answer / shahid
we can not transport any requests from production to
development, transporting of request can only be done from
develpment to quality, as we cant create any transport
request in production environment we there fore cannot
transport any request from production to development.
Is This Answer Correct ? | 3 Yes | 5 No |
Answer / sanjay
Yes We can make a Client Copy by client export method, from
the Souce PRD system to target DEV System.
and also not in case of client export only but in normal
process we can also move transport from PRD System to DEV
System if required.
Is This Answer Correct ? | 0 Yes | 3 No |
If java is down how you will do trouble shooting?
What is RFC. why will use RFC.
Where the transport data files will be placed?
How to configure TMS?
What are the profiles that are maintained in the R3 system?
If a background job runs more than the time it should be completed normally then what action will u take ? Plz Post the Answer
hey all, I am trying to install SAP 4.6C on a Windows 2003 server Enterprise edition. well at the time of the installation of Oracle 9.0, am I also suppose to create a database. well, If I do, then it gives me an error at the time of the installation of Database Instance at a stage where the SAP database creation takes place, If I don't then SAP database creation succeeds, all the tablespaces are created successfully, however the post oracle configuration stage gives an error, stating that an SQL statement exec failed... what should I do, Please Help....
What are the transport routes?
Transport error codes and their description?
How to lock a transaction?
when performing client copies what steps you need to take from CUA point of view?
Which are the most frequent errors encountered while dealing with transports ?