can we transport requests from production to development for
client copy using scc8?
Answer Posted / sanjay
Yes We can make a Client Copy by client export method, from
the Souce PRD system to target DEV System.
and also not in case of client export only but in normal
process we can also move transport from PRD System to DEV
System if required.
| Is This Answer Correct ? | 0 Yes | 3 No |
Post New Answer View All Answers
Is sap a database ?
What is your UNIX experience and the types of UNIX systems you have worked on.
how can i decleare select-options in module pool table control?
What is difference between oracle 9i and oracle 10g?
What is an ‘ok’ code? What are the differences an ‘ok’ code to a ‘t-code’?
How to configure TMS?
what is role of sap administrator in pi & ep?
what is the difference b/w 4.7EE & ECC5.0?
What is the purpose of table tadir?
Is it possible to install ecc 5.0 as a test system and not production, without installing solution manager?
How many types of work processes are there in sap ?
How to perform a sap-export and import tables in sap from os level?
Is it possible to install sap patches when other users are online?
Explain the architecture of sap system with different layers. What is the use of gateway?
How do I know what threshold values to set