wat is the difference between real power and reactive power..which is useful..?and how it s useful..wat is the effect of these on a power system...
ABB,
10 24310why AC signals are represented by sinusoidal waveform?WHY other waveforms not used for representation
4 8783In tranformer winding Connection Like Dyn1 ,so LV lags Hv by 30 deg and Dyn11 LV lead HV by 30,so how do this lagging and leading afffect the transformer??
2 6711Post New Electrical Engineering Questions
Explain the different methods used in the choice of rotor slots for reduction of harmonic torques in an induction motor.
(1)The demand for electricity , the amount of renewable generation available, the amount of fossil fuel generation available and the cost of the fossil fuel generation are shown in table below period(hrs) demand(MW) renewable (MW) fossil- fuel(MW) cost of fossil fuel(MW) 00.00 - 01.00 2000 1800 2000 30 01.00 - 02.00 2300 2500 2000 30 02.00 - 03.00 2500 2700 2100 45 03.00 - 04.00 2900 3100 2100 50 04.00 - 05.00 2700 2600 2500 45 05.00 - 06.00 2400 2000 2700 50 06.00 - 07.00 2200 1800 2000 36 07.00 - 08.00 2100 1600 2000 36 Assuming that the renewable generation incurs zero cost, determine an optimal generation schedule(specifying the amount of renewable generation and fossil fuel generation used in each period, the cost for each period and the overall cost for 8 hours.)
What should be the length of transmission line so that we can see/obtain the full sine wave of voltage??
CAN CU XLPE/PVC CABLE BE USED INPLACE OF LOW NOISE SCREENED CABLE? KINDLY GIVE REASONS
What is I to C?
What are the advantages of a three-phase system over a single-phase system?
Sir, I m 3rd year student 4m DCE and want to do internship in siemens or l&t or any other mnc related to electrical engineering. please tell me the procedure 4 same and oblige me
What is essential to prove safe isolation of electrical circuit?
Please clarify, 1. Is it required to lay two runs of GI wire along with Armoured LT cable if it is laid between one big mains (63Amps TPN SDF) to small main (32A TPN SDF) with proper glanding termination? 2. If the armoured cable with proper glanding is laid from DB to CNC machine, is it required to run two runs of body earthing to the Machine from DB? 3.If the armoured cable with proper glanding is laid from Substation to Hangar, distance is approx. 100 mtrs, is it required to do earthing at shop area though the primary termination at substation is earthed through gland.
How the frame size of a flange mounted AC induction motor is calculated?
Why should we hire you over the others waiting to be interview?
during installation time of transformer and alternator which points we have to observed?
how many types control panel of a 132/33 kv substation
Explain the purpose of inductor in an electric circuit?
What test must you do before powering up a circuit that you have been working on?