why our power production in multiple of 11, in strictlly asking why our o/p voltage of alternators is 11kv only and whynot graterthan 15 and016KV?
4 5403Post New Electrical Engineering Questions
What do you understand by avr?
If any HVDC line is going with positive & negative(the negative usually have return path of current with earthing electrode). Now the question is if this HVDC earthed electrode which is using as return path and earthed any nearby 400kv or 220kv AC substation equipments. which will be the impact of this on AC substation & its equipment, how severe may be this and what should be the minimum distance require between HVDC earthed electrode and AC substation equipments? It's really an high engineering level question...Dare to answer and increase your knowledge.
What are the components connected in between the power supply coming from an electric pole to HT & LT Panels in a large commercial building or how the power supply connected from Electric pole to Transformer & then to the HT & LT panels of a building? Please send me answers via mail, my id is yogiagarwal@gmail.com. If possible, please give a line diagram.
In what condition the HT fuse breakes?
Explain what cmos is and its benefits?
There are Two questions about Steam Turbine Generator... What is HRSG bypass of LP, HP used for in power generation? In particualar, in the event that fault of HP bypass, there would be STG TRIP in operation but none on the LP bypass fault...what's the reason ?
what is ratio of copper wire size and current ?
WHAT HAPPENED DC SERIES MOTOR FIELD WINDING OPEN. CAN POSSIBLE.
can u describe the method used for protection of transmission line.
If a high resistance fault occurs,then what are the changes will happen in the system?
Parts of machine and their discription in details with suitable photo
WHICH SIZE A.B.CABLE IS USED FOR 11KV.
What is the difference between circuit breaker and isolator
new 90kw motor installed so how I purchased cable ,fuse,etc please give me technic for cable selected why always capacitor delta connection
hi, i finished b.tech eee in 2008, im worked in dg sets mfg company , now i left job in 6months back, now again i want get job core side, how can i get? is there any couses we have learn to get better oppurtunity? /