Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379) in the case of 6.6kv motor starter combination contain fuses on it VCB. but in 11KV motor starter combination Fuses are not using in it's VCB why?
1 2347why HT motors are earthed only at equipment side & for it's single core cable with aluminium wire armoure using?
1 4410why Batteries & Battery chargers are used in substation? what is the different between UPS & battery charger?
DLF,
4 53042In the case of petrochemical area AC drive & AC motor is used where the speed variation is required. Why they are not Using DC drive & DC motors in such areas?
1 4370which one is more efficient, torq, power & ecnomy with the same frame size AC motor / DC motor?
1 2246what is the minimum (Common factor) insulatin resistance of the following a, 4mm sq wire b, cable from 50 mm sq to 800mm sq
1 2183why we always consider Bulkage due to the voids only for the Fine aggregates not for the Coarse aggregates
3 9642
Can any one please send me the hpcl question papers or pattern for ece branch please mail to sweetyastweety@gmail.com
I am in need of question set of ONGC Electronics & Communication
sir most regardly i want previous papers of your company for my preparation of my written exam
what is the 0 value in quantity surveying
i m selected in AAI JE. my interview is on 25 sept. 2010. i don't hv any idea abt aai interview. can anyone help me, i want to know interview qus of aai. so pls help me... my e-mail id -- mailmanish_kumar@yahoo.co.in
Hey guys anyone plzzz tell me the syllabus for Vizag Steel Plant (IT & Mechanical Streams)........ And Aslo plzz send the materials or previous papers of vizag Steel Plant Management Trainees for both IT & Mechanical Streams......... plzzzzzzz......... Plzzzzzzz
i want bhel placement paper for electrical if anybody having pl send to my id kavitha867@myway.com immediately
pls send me model paper of NPCIL for executive trainee. and syllabus of executive trainee 2015.
hiiiii sir ..tell me the written test pattern for symphony teleca.....pleaseee
A 15 kw squirrel cage motor having a maximum efficiency of 90% on a continuous full load has temperature rise of 42 degrees celcius after 30 min and 52 degrees celcius after 1 hr under the above operation conditions. a) calculate its final steady state temperature rise on continuous load and the heating time constatnt. b) if the motor is operated on a short load for 9 min estimate its temperature rise. c) calculate the maximum overload that can be applied on a short, 9 min rating so that the temperature rise is the same as the final steady state temperature rise on continuous load.
i need modal Q. paper of junior enjineer for 1/2009 rrb ajmer exam cat no. 11 jell electrical thenkyou
• What is your weakness?
What are the different methodes for calculating the short circuit Current?
Explain the approximate cost of the following corrosion monitoring systems. Smart pebbles eci-1(embedded corrosion instrument) monitoring cables time domain reflectometry &corrosion penetration monitoring system(cpmp)?
Hello sir, I am Rajaram. I have finished DME (Diploma in Mechanical Engineering). I would like to attend BHEL supervisor examination. So i want which type of questions can i prepare. & give previous supervisor examinations questions. Reply my mail (rajaramsptc@gmail.com)