Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379) What happened when Delivery valve closed and Suction valve open in centrifugal pump.(in running conditions)
KFCL,
3 9332A distillation column separates 10000 kg / hr of a mixture containing equal mass of benzene and toluene. The product D recovered from the condenser at the top of the column contains 95 % benzene, and the bottom W from the column contains 96 % toluene. The vapor V entering the condenser from the top of the column is 8000 kg / hr. A portion of the product from the condenser is returned to the column as reflux R, and the rest is withdrawn as the final product D. Assume that V, R, and D are identical in composition since V is condensed completely. Find the ratio of the amount refluxed R to the product withdrawn D. Hint : Solve the simultaneous equations as follow in order to find the answer (R / D) : 10000 = D + W; 10000 (0.5) = D (0.95) + W (0.04); 8000 = R + D.
2 14140Two methanol-water mixtures are contained in separate tanks. The first mixture contains 40.0 wt % methanol and the second contains 70.0 wt % methanol. If 200 kg of the first mixture is combined with 150 kg of the second, what are the mass and composition of the product? The symbol of weight percent is wt %.
2 8569Chemical Engineering Material Balance - Three hundred gallons of a mixture containing 75.0 wt % ethanol and 25 wt % water (mixture specific gravity = 0.877) and a quantity of a 40.0 wt % ethanol - 60 wt % water mixture (specific gravity = 0.952) are blended to produce a mixture containing 60.0 wt % ethanol. The specific gravity of a substance is the ratio of density of a substance compared to the density of water. The symbol of weight percent is wt %. (a) Estimate the specific gravity of the 60 % mixture by assuming that y = mx c where y is wt % ethanol, x is mixture specific gravity. Values for m and c are constants. (b) Determine the required volume of the 40 % mixture.
1 12025according to the painting co efficient, we should take the one side of doors (or) windows or both sides?
1 1851
Can any body help to get Rsemulator 5000 free from internet if possible then give me any link or any help .
i want to get rrb solved paper of s.e. & j.e.. on my mail mraj.meena@gmail.com
hai can anyone send me soft copy of o.p gupta or tell me downloading link please please at saify_0@hotmail.com
Define the overload capacity of the motor?
Please nybody say, weather the result of Bharat Oman is declared or not? Probable date of declare???????
Pls mail me utility & Dg related question with answer
plz give sample question paper of hpcl thank you shinde_murali@yahoo.co.in
Is it possible to measure correct value of earth resistance & cable insulation ristance with out disconncting earth lead & both sides of cable ends? If not, any other method to measure ER & CIR with out disconneting from the system.
What is the height of DA, DAL, DB, DC & DDE tower?
THIS IS HARI PRASAD. I KNOW THAT HVAC MEANS HEATING VENTILATION & AIR- CONDITIONING. I NEED DESIGN CONSIDERATION OF HVAC UNIT.
Punj lloyd is coming in our Jadavpur Universtiy campus for campus placement. Please send me some hints about the writtend exam. My email id is subratafriends@gmail.com
I am shobana from Chennai. I am having my personal interview on 19th Dec at Chennai.kindly mail me the questions to mail id shobana.shanthi@gmail.com
Why patra you join
pls any one send me the last 5 years rrb QP - hari.devarajan@gmail.com
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?